My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO26603
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO26603
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:46:04 PM
Creation date
11/20/2007 6:52:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Hydrology
Doc Date
1/30/1997
Doc Name
4th Qtr 1996 INSPECTION
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.~_ - - ~~ ~,,,~ ... <br />~ ~ BASIN\RE•SOUI~CES, INC. <br />SEDIMENTATION POND INSPECTION FORM <br />,,_. , .._.,~:,Y <br />Pond ~(~~ ~~~ ~i/1-Q- NPDES No. <br />Date of Inspection i ~U /9 ~ <br />EMBANKMENT <br />1. Adequacy of the vegetative cover: xcellen ivioderate, Few, Poor <br />2. Erosion forating gullies: Extensive, Some, Very Few, None <br />7. Is wave action causing erosion: <br />On the upstream embankment? Yes No L <br />At the principal spillway inlet? Yes Nom <br />4. Erosion of the downstream toe of the embankment? ~'es <br />The cause of the erosion is attributed to: <br />Is seeaec accumng through the dam" <br />;,o~~ld t;~s seepage cause potential tnstabihty? <br />L::plun. <br />t es <br />25 <br />No (/ <br />N'o ~ <br />No_ _ _ <br />PRINCIPAL SPILLWAY <br />1. Is [he principal spillway rystem in working order? <br />2. [s the inlet free of debris and restrictive material? <br />3 Is the discharge outle[ free of restrictive material? <br />Yes L No <br />Yes ` Na <br />Y"es ~ No <br />4. Is erosion occurring at the dischazge outlet? Yes No ~ <br />Evaluate the severity: Extensive Moderate Just Starting None <br />EMERGENCY SPILLWAY <br />1. [s the overall emergency spillway system capable of passing design storm discharge? <br />Yes v No <br />?. Does i[ appeaz as if the emergency spillway has discharged water since [.he last mspection? <br />Yu No ~ <br />3. Is erosio^ occurring at any section of the emergency spillway? Yes No L~ <br />Describe [he extent: <br />SEDIMENT STORAGE CAPACITY <br />1. Has the design storage capacity of the yes rvoir been surpassed? Yes _~ No C~ <br />If yes, explain: D:~ ~_ Sid-iaO~ l4"aF.~A i.i~"~~ ~Qdz,C~r-1•!(Z~.Z~'/~ <br />Please add any special comments concerning potentially dangerous problems on the ark of this <br />sheet! ~ ,(A <br />- Inspected by: <br />
The URL can be used to link to this page
Your browser does not support the video tag.