Laserfiche WebLink
III IIIIIIIIIIIII III <br />999 <br />E~~A <br />S Coal Company <br />Seneca Coal Company <br />RECEIVED <br />APR 14 1995 <br />Mr. Wallace Erickson <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />April 11, l$~~iFion0luunerais&Geology <br />RE: Seneca II Mine (C-80-005) Quarterly Stockpond Inspection <br />Dear Mr. Erickson: <br />Enclosed are copies of the first quarter Stockpond inspections <br />for those structures at Seneca II that have been certified. <br />Inspections for Stockponds T-15, T-16, T-25, T-26, T-28, T-30 <br />and T-31 are also included. Construction of these Stockponds has <br />been done, but they require some maintenance work to make them <br />complete. The gas-built certifications will be submitted as <br />soon as possible once they are finished. <br />Also, maintenance items noted in the October CDMG inspection to <br />the certified Stockponds were unable to be completed due to <br />winter weather conditions. These items will be addressed when <br />ground conditions are conducive for the necessary repairs. <br />Should you have any questions, please do not hesitate to call. <br />Sincerely, <br />~ ,~. Q~ <br />Michael G. Altavilla, P.E. <br />Engineering Manager <br />Enclosure(s) <br />c: Fred Fest <br />Dennis Jones <br />Seneca Coal Company • P.O. Drawer D • Hayden, Colorado 81639 <br />Telephone (303) 276-3707 • FAX (303) 276-3014 <br />