Laserfiche WebLink
• III IIIIIIIIIIIII III <br />999 <br />i <br />At1ENDMENT TO SUNDAY MINE PERMIT APPLICATION (77-285) <br />I <br />II <br />Exhibit F <br />As shown on map, Exhibit F, by shaded area the present surface disturbance <br />consists of a portal site with buildings, cribbing, power lines., ore dumps, <br />waste dumps, and access roads. The older areas as marked consi~;t of access <br />roads to ventilation sites and a proposed retention pond. The ventilation <br />sites are comprised of cut-out areas with a concrete slab with mounted fan. <br />Future disturbances are expected to be minimal with some requirE~ments for <br />ventilation sites and access roads at sites not yet selected. <br />Revegetation: <br />A. Areas to be revegetated: All areas having a topsoil soil which should <br />comprise most of the areas shown on the map except for some small areas <br />composed of bedrock and large boulders. Areas to be revegetated: <br />1. Portal site and facilities <br />2. Access roads <br />3. Ventilation sites <br />4. Retention ponds <br />B. All areas to be revegetated will be seeded and prepared as described <br />in the reclamation plan, except the seed mixture is to be amended to <br />read as follows: <br />Sand Dropseed <br />Crested Wheatgrass <br />Western Wheatgrass <br />Fourwing Saltbush <br />Indian Ricegrass <br />Yellow Sweetclover <br />III <br />Slopes: <br />0.5 #pls/acre <br />3.0 <br />3.0 <br />3.0 <br />2.0 <br />2.0 <br />The Sunday Mine site is located in the south wall of Big Gypsum Valley. <br />Most of the site is located on steeply sloping (20-40%) shale outcrops <br />that blend into a gentle slope and valley floor. Grading of the surface <br />disturbances will be done so as to conform with the existing topography <br />with final slopes of 0-40%. <br />IV. Ponds: <br />The retention ponds will be built to take advantage of the rough terrain, <br />utilizing draws, depressions, etc. The ponds will be removed at the close <br />of mining unless the BLM requests they remain for natural water impoundment. <br />V. Topsoil: <br />Topsoil has not been salvaged as this is an existing operation. <br />