Laserfiche WebLink
HOMAKE <br />ROY R. CELLAN <br />CORPORATE MANAGER <br />RECLAMATION <br />November 15, 2000 <br />Nov? y ?~~ <br />®iVisioq o/Minerals and 6eufa9Y <br />,sue:. 'fa - +. <br />i~ "`~ 'G~1- ~579,2i `~~~~,A <br />State of Colorado f' /`~ `°'~'~"• <br />Division of Minerals and Geology Pa~~.~f' <br />Durango Field Office <br />701 Camino Del Rio, Room 125 <br />Durango, CO 81301 <br />Attn: Mr. Steve S. Shuey, Reclamation Specialist <br />III IIIIIIIIIIIII III <br />999 <br />ENVIRONMENTAL, HEALTH, SAFETY <br />AND GOVERNMENT AFFAIRS <br />R~eivea- <br />NOV ~ 2 ?000 <br />D <br />Urv/spn of M e ais & Gep °9Y <br />RE: Bulldog Mine Reclamation Proiect October, 7.000 Monthly Monitoring Report <br />Dear Mr. Shuey: <br />Pursuant to the Technical Revisions to the Reclamation Permit for the Bulldog Reclamation <br />Project, this is the thirty fifth monthly report pertaining to 1) installation and operation of <br />an infiltration trench to accommodate seepage from the 9360 adit, and 2) closing the valve <br />at the 9360 adit plug. The Division of Minerals and Geology IDMGI, in a letter dated <br />March 8, 1999, issued a conditional approval for Homestake Mining Company (HMC) to. <br />close the valve at the 9360 adit plug. Subsequent to DMG's approval, HMC closed the <br />valve to the adit plug on April 1, 1999. Since closure of the adit plug valve, no flow has <br />been directed into the infiltration trench. Monitoring of the hydraulic conditions behind the <br />adit plug indicated that as of August 25, 1999, conditions had stabilized (ie pressure <br />measurements stabilizedl• As a result, DMG approved initiation of the planned tracer test <br />(Ref: Letter from WMCI to Mr. Steve Shuey, dated August 27, 19991. The tracer test <br />subsequently began on September 9, 1999. With the initiation of the tracer test, HMC is <br />committed to the monitoring summarized in Table 1 in accordance with the approved <br />Technical Revisions. <br />The revised monitoring program was initiated in September 1999. A summary of the <br />monthly monitoring data is presented in Table 2. Based on the required visual inspection <br />around the adit plug, the plug is impounding water behind it with no signs of seepage <br />and/or development of seeps around the portal area. No tracer test samples or water <br />quality samples were taken in October 2000 as none were required. <br />As part of this monthly report and in accordance with the 9360 Level Adit Closure <br />Monitoring Plan, dated April 1998, Windy Gulch monitoring was continued during this <br />period. Water levels in the Creede Formation Well, located upslope of the 9360 Adit, have <br />been recorded continuously since its installation, and data for the last year are presented <br />graphically ih figure 1. Flow data for the WGL Weir has been recorded continuously with <br />an automated datalogger since April 19, 2000. As reported in June, the instrumentation <br />was vandalized on May 5, 2000, preventing the collection of any data from that day <br />through June 8, 2000. The equipment was reinstalled in June; however, the stream was <br />HOMESTAKE MINING COMPANY <br />PO. BO%99 • GRANTS. NM 9]020-0011 <br />