September 06, 2007 <br />Mc Allen Sorensen <br />State of Colorado <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Re: Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB PerrnitNo. M-88-112 <br />gust 2007 Monthly Report <br />Dear Mr. Sorensen: <br />-~7 ~' <br />Asio0 0 '` `-% <br />/ V ~;~ <br />:~'~r:r <br />_~ <br />The following summarizes monitoring and site activities at the Battle Mountain Resources Inc. <br />(BMRI), San Luis Project for the month of August 2007. <br />Surface and ground water monitoring and analysis were completed for all requved sites during <br />the month per the terms and conditions of the TR-32 Quality Assurance and Quality Control <br />(QA/QC) plan. <br />Vacuum on the tailing lysimeters was verified on August 30t°, no water was present for sampling <br />and subsequent analysis. <br />Depths to water were collected for the tailing impoundment main embankment piezometers and <br />the West Pit monitoring wells on August 29s'. August tailing impoundment piezometer <br />measurements identified these installations were either dry or contained less than 12 inches of <br />water as illustrated in Table 2. Tables 1 and 2 below identify the depth to water measurements <br />collected for each of the site monitoring wells, piezometers and lysimeters as required by the <br />terms and conditions of the TR-32 QA/QC plan. <br />The tailing impoundment collection pond underdrain flow was pumped intermittently during the <br />month to minimize the collection pond level. The leak detection system was measured on August <br />29`". The August tailings pond underdrain flow average was 33.37 gpm and a total of 540 gallons <br />of water was excavated from the leak detection system yielding a monthly average of 18.62 gpad. <br />During August the West Pit water treatment plant operated efficiently discharging a total of <br />8,858,700 gallons (27.19 acre-feet) of water to Rito Seco Creek and a total of 970,800 gallons <br />(2.98 acre-feet) of water was transfen•ed from the water treatment plant to the tailings <br />impoundment. Seepage along Rito Seco Creek remained dry during the month. <br />~~ tel. <br />P.O. Box 310 • San Luis, Colorado 81152-0310 • (719) 379-0798 Fax (7l9) 379-0713 <br />