Laserfiche WebLink
z <br />C <br />LL_ <br />C <br />d <br />a <br />u <br />L <br />C <br />I <br />I <br />IO <br />O <br />N <br />I � I <br />O <br />IC I <br />O I <br />un <br />A i I <br />O <br />N <br />W <br />O <br />C <br />cn i <br />rn <br />PLAN VIEW - SUBSTATION No.3 FACILITIES SITE MAP <br />100 1 <br />L EGEND I <br />Hill PERMIT BOUNDARY <br />WATERSHED BOUNDARY <br />DITCH <br />CULVERT <br />- - -- -- BERM <br />UTILITIES <br />G . u. <br />UNPAVED ROAD <br />PAVED ROAD <br />NEW /MODIFIED ROADS <br />- JEEP ROADS <br />NOTE: ORIGINAL MAPPING INFORMATION PROVIDED BY OXBOW MINING INC. <br />PROFESSIONAL ENGINEER'S STA TEMENT <br />1, Thomas E. Leidich, state that this map <br />was prepared under my supervision and "E <br />the information presented hereon is toF <br />g>�l,� <br />and correct to the best of my kno <br />and information. ;•oF <br />6 y 0/ <br />Date omos E. L eidich, CO P. <br />Permit Number L" d <br />Class: OPermit <br />Section /Exhibit C'i -hlf (r •. -� r f '� <br />- -- - <br />-- 2- -- - --- - -- - -- -- / --- -- -- -- - -- -- <br />Class: 0 Revision <br />TypelS_eQ <br />■ Class O Report O Hydro Odeneral <br />— _ .___ -.__ <br />OApplicalion (Coal only) <br />0 Bond 0 Enforcement 0 Inspection <br />