Laserfiche WebLink
Tab 14 <br /> RECLAMATION PLAN <br />• <br />Rule Description Page <br />2.05.4(2) Reclamation Plan ............................................. 14-1 <br /> List of Tables <br />14-1 Reclamation Soils Balances & Areas <br />14-2 Stockpile Volumes 8 Redistribution <br />14-3 Temporary Seed Mixture <br />14-4 Permanent Seed Mixture <br />14-5 1999 Vegetation Sampling <br />14-6 Permanent Seed Mix for 2 West Portals and South Fan <br />14-7 RDRDA Borrow Area -Quantity Calculation <br />14-8 Permanent Seed Mixture -Lowland and Upland Components <br />14-9 Permanent Seed Mixture -North Decline, Fall 1992 (Historical) <br />1410 Permanent Seed Mixture -CRDA 2 8 3 (Historical) <br />14-11 Permanent Seed Mixture - Ute Water Disturbance, 2000 (Historical) <br />14-12 Interseeding Seed Mixture -CRDA 2, November 2001 (Historical) <br />14-13 Permanent Seed Mixture - (Historical) <br />14-14 North Decline Interseeding <br />14-15 Salt Tolerant Seed Mix <br /> List of Figures <br />14-1 Reclamation Timetable <br />14-2 Permanent Mine Seal <br />14-3 Permanent Drill Hoie Seal <br />14-4 Refuse Pile Animal Habitat <br />• <br />145 RSDA South End Rirrap Ditch <br />14-6 Roadside South Portal Mine Water Discharge System <br />147 Roadside South Portal Dewatering Schematic <br />14-8 Mine Dewatering -Plan and Profile <br />14-9 Roadside South Portal -Mine Inflow Rate Determination <br />14-10 North Decline Mine Discharge System -Flow Calculation <br />14-11 Siphon System -Flow Calculation without Siphon Influence <br />14-12 Debris Fin <br />14-13 Cameo Borrow Area No. 1 <br />14-14 Portal Highwall <br /> List of Appendices <br />14-1 BLM-Proposal for Revegetation Research Project <br />14-2 Reclamation Plan Cost Estimate <br />14-3 Reclamation Costs, Cameo Refuse Disposal Areas No. 2 and other Areas <br />14-4 Other Reclamation Cost Estimates <br />14-5 Affected Land Owners Reclamation Approval <br />14-6 Final Reclamation Drainage Design <br />14-7 Revegetation Evaluation -Diversity <br />14-8 Slope Stability Analysis -Roadside South Portal <br />14-9 Approximate Original Contour Variance <br />14-10 Steep Rock Slope Retention <br /> List of Exhibits <br />RS-11-008 Roadside Mine Revegetation Field Trials of Refuse Pile <br />• 6C <br />6C-A Roadside Mine-Post Mining Topography <br />Active Area/Alternative Land Use <br />7C Overland Conveyor-Post Mining Topography <br />8C Cameo No. 1 Mine-Post Mining Topography <br />PR-3 (Rev 6107) <br />