Laserfiche WebLink
• 2.03.8 -PERMIT TERM INFORMATION <br />The anticipated start of each phase of mining activities is discussed in <br />Section 2.05.2 and 2.05.3 Operations Plan. <br />The anticipated number of acres of surface lands to be affected (possible <br />subsidence) during the term of this permit: <br />LOCATION EXTENT DURATION <br />Surface Facilities 22.36 Acres Life of O eration <br />Underground Mining 295.5 acres <br />The term of the permit shall be for five (5) years from issuance, renewable <br />under the terms of Rule 2.08.5. <br /> <br />-~ ~moiozsi~srooioiuiiiiiiiiiiimiim~iinnsiiiiimvioooioisiuivuiiuu~imoiuioiiooiioiie~oiii~i~ooioiiuu~ioiiiw <br />National King Coal, LLC King II Mine <br />Section 2.03.8 <br />Page 1 May, 2006 <br />