My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE58325
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE58325
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:00:37 PM
Creation date
11/20/2007 5:49:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982186
IBM Index Class Name
Permit File
Doc Date
9/8/1982
Doc Name
COLLINS PIT 82-183 STRATTON PIT 82-184 ALLEMAN PIT 82-185 BEESON PIT 82-186 SMELKER PIT 82-187 LEOFF
From
MLR
To
WILLIAM D COURTRIGHT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
?, <br />DEPARTMENT OF NATURAL RESOURCES <br />D. Monte Pascoe. Executive Director <br />srnTe oe co~_oROOO H~i..~~w~~~.,,., c~ III IIIIIIIII"II'll <br />11'i1NED LAND RECLAMATION <br />423 Centennial Building, 1313 Sherman Street <br />Denver, Colorado 80203 Tel. (303) 866-3567 <br />David C. Shelton <br />Director <br />September 8, 1982 <br />Mr. William D. Courtright <br />Foreman, Kit Carson County District 42 <br />P.0. Box 162 <br />Stratton, Colorado 80836 <br />Re: Collins Pit 82-183 <br />Stratton Pit 82-184 <br />Alleman Pit 82-185 <br />Beeson Pit 82-186 <br />Smelker Pit 82-187 <br />Leoffler Pit 82-188 <br />Hornung Pit 82-189 <br />Dear Plr. Courtright: <br />This letter is to notify you that in order for the above cited applications to <br />be considered adequate for Board presen[ation the following items must be <br />addressed. <br />1. lde need a statement that, for those pits located in streambeds, no <br />mining or stockpiling will take place in the streambed during <br />streamflow events. <br />2. Apparently t}ie Hornung Pit (82-189) and the Alleman Pit (82-185) <br />have little or no topsoil. Your reclamation plan for these pits <br />commits to replacing 6 inches of topsoil. Unless you have a <br />definite source for the reclamation topsoil, you may want to con- <br />sider changing the reclamation plan for these pits to state that <br />0-6 inches of topsoil will be replaced. This will avoid the future <br />problem of replacing 6 inches of topsoil on areas where no topsoil <br />was removed. <br />3. Beeson Pit: Any streambanks which are disturbed should be graded <br />to a 2:1 or gentler slope. Also an additional grass, such as west- <br />ern wheatgrass, should be planted. <br />4. Stratton Dump Pit: The proposed seed mixture should be expanded to <br />include Blue grama and western wheatgrass. <br />Assuming [hat we receivethe proof of publication and adequate responses to the <br />above items prior [o September 17th, I will recommend approval of these applica- <br />tions at the September Board meeting. Although you are welcome to attend the <br />Board meeting, your presence will not be neceessary. <br />
The URL can be used to link to this page
Your browser does not support the video tag.