My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO25668
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO25668
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:45:20 PM
Creation date
11/20/2007 5:47:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
Hydrology
Doc Date
11/13/1984
Doc Name
SUGGESTED QUARTERLY POND INSPECTION REPORT
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUGGESTED QUARTERL~O2T INSPECTION REPORT • III III III IIIIIIIIII <br />OPERATOR: Blue Ribbon goal Go. RECEIVED 999 ~- <br />MINE: Blue Ribbon Mine <br />NOV 13 1984 <br />DATE OF INSPECTION: 7-18-84 <br />L~lNED LAND RECLAMATION DIVI~fDN <br />1 2 3 rein nor ~ u,~,,.,~ o,......., <br />POND IDENTIFICATION <br />TYPE OF POND <br />1 2 3 4 <br />Impound. Sed. ~3ediment Sediment Sediment <br />OPERATIONAL STATUS AT TIME OF INSPECTION <br />Approximate water level: ~k1S2 -Just above ma:l. sed.level, ik3d~4 Below max. Sed. <br />Sediment level(% total storage):~T _ni~r~ _ bnir~k3y, _ 0% _ <br />Outflow(xfs3: ik152 - 63gpm, 4k36~4 - no Flow <br />FFATI!RES <br />PRORT E"! <br />COMMENTS <br />EROSIONAL: <br /> <br />Rills b Gullies on Embankment ES <br /> <br />x NO Flooding in May and June did damage to <br />dk1,3S4 Ponds. Ikl had erosion over the <br />so <br />th end in id <br />theref <br />e <br />r <br /> <br />Inadequate Vegetation u <br />o <br />e an em <br />rgency <br />ay <br />s <br />illwa <br />was added(30' X 1 <br />;13 fille <br />5 ) <br />Outlet Channel Erosion x p <br />y <br />. <br />. <br />with sediment in tune <br />ik4 had th <br />ond <br />Burrows x . <br />e p <br />embankment break in both Ma <br />and Jnne <br /> <br />Other <br />x y <br />. <br />STRUCTURAL: 'ES NO <br />Differential Settling <br />Crack= or Slides <br />Seepage x <br />Other x <br />PLTRTENANT STRUCTURES: ES NO kl had emergency spillway installed <br />Defective Spillways x k3 had dewatering deviee and primary <br />Dewatering Device Clogged x spillway repaired. <br />Faulty Gates, Baffles, Pumps x k4 had emergency spillway rdplaced after <br />Other x f <br />DITIONAL COMMENTS: device replace aater the Junk flood <br />The flooding in play was a result o- high snowmelt runo•.c. <br />!~IB~I%RHHY The °looding in June was a result uF a storm. All repair <br />work has been done. The embankment on the ik4 pond needs re-seeded. <br />NAME OF INSPECTOR: ~~%%'~.1~'4 <br />:ring, <br />.~ <br />~ RL/82 <br />
The URL can be used to link to this page
Your browser does not support the video tag.