My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO25276
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO25276
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:45:04 PM
Creation date
11/20/2007 5:26:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Hydrology
Doc Date
4/11/2007
Doc Name
March 2007 Monthly Report
From
Battle Mountain Resources, Inc.
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e+ y~ , <br />April 09, 2007 <br />Mr. Allen Sorensen <br />State of Colorado <br />Division of Minerals <br />1313 Sherman Street, <br />Denver, CO 80203 <br />Re: Battle Mour <br />San Luis Pn <br />C RB Pe. <br />arch 2007 <br />Dear Mr. Sorensen: <br />The following sur <br />(BMRI), San Luis <br />Surface and ground <br />the month per the 1 <br />(Q~QC) Plan. <br />Vacuum on the <br />and subsequent <br />MOUNTAIN RESOURCES, INC. <br />Geology <br />~m 215 <br />Resources Inc. <br />No. M-88-112 <br />nthly Report <br />r, <br />s monitoring and site activities at the Battle Mountain Resources Inc. <br />for the month of March 2007. <br />monitoring and analysis were completed for all required sites during <br />and conditions of the TR-32 Quality Assurance and Quality Control <br />lysimeters was verified on March 29'", no water was present for sampling <br />Depths to water were collected for the tailing impoundment main embankment piezometers and <br />the West Pit monitoring wells on March 29'". March tailing impoundment piezometer <br />measurements identified these installations were either dry or contained less than 12 inches of <br />water as illustrated in Table 2. Tables 1 and 2 below identify the depth to water measurements <br />colh;cted for each of the site monitoring wells, piezometers and lysimeters as required by the <br />terms and conditions of the TR-32 QA/QC plan. <br />The tailing impoundment collection pond urrderdrain flow was pumped intermittently during the <br />month to minimize the collection pond level. The leak detection system was measured on March <br />29m. The March tailings pond underdrain flow average was 46.44 gpm and a total of 630 gallons <br />of water was excavated from the leak detection system yielding a monthly average of 21.72 gpad. <br />During March the W Pit water treatment plant operated efficiently discharging a total of <br />8,465,700 gallons (25.98 acre-feet) of water to Rito Seco Creek and a total of 1,027,600 gallons <br />(3. i 5 acre-fcet) of water was transferred from the water treatmenrt plant to the tailings <br />impoundment. Seepage along Rito Seco Creek remained dry during the month. <br />1/ <br />P.O. Box 310 San Luis, Colorado 81152-0310 (719) 379-0798 Fax (7l9) 379-0713 <br />
The URL can be used to link to this page
Your browser does not support the video tag.