Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />MAP N0. <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />Doc Date:12/11/2001 <br />~~_ <br />W <br /> ANA ~ ~ 1~6p <br />s LIST OF MAPS ,Y~c, <br />~ 'u~NED~q <br />1r PAT,~~ n ~, ,,, <br /> ~~ <br />TITLE VOLUME N0. <br />Mine Area Surface and Mineral 0wnership ... ..........3 <br />Loadout Area Surface Ownership ............ ..........3 <br />Loadout Area Mineral Ownership ............ ..........3 <br />Mine and Loadout Area Land Use ............ ..........3 <br />Regional Hydrogeologic Map ................ ..........3 <br />Mine Area Pre-Mining Topography ........... ..........3 <br />Mine Area Pre-Mining and Post-Mining <br />Cross Sections .......................... ..........3 <br />Mine Area Geology ......................... ..........3 <br />Geologic Cross-Sections A-A' and B-B' ..... ..........3 <br />Geologic Cross-Sections C-C' and D-D' ..... ..........3 <br />Geologic Cross-Sections E-E' and F-F' ..... ..........4 <br />Mine Area Surface and Groundwater <br />Hydrology ............................... ..........4 <br />Loadout Area Surface and Groundwater <br />Hydrology ............................... ..........4 <br />Mine Area Soils ........................... ..........4 <br />Loadout Area Soils ........................ ..........4 <br />Mine Area Vegetation ...................... ..........4 <br />Mine Plan ................................. ..........4 <br />Mine Surface Facilities ................... ..........4 <br />Access and Light Use Roads ................ ..........4 <br />Drainage and Sediment Control ............. ..........4 <br />Sedimentation Pond No. 1 Design ........... ..........5 <br />Mater Treatment and Recycle Pond No. 2 <br />and Freshwater Pond No. 3 Designs ....... ..........5 <br />Sedimentation Pond No. 4 Design ........... ..........5 <br />Sedimentation Pond No. 5 Design ........... ..........5 <br />Magpie Creek Diversion As-Built Drawings.. ..........5 <br />East Loadout Area Pond L1 and Drainage <br />Structure Design ........................ ..........5 <br />West Loadout Area Pond L1 and Drainage <br />Structure Design ........................ ..........5 <br />Mine Area Postmining Topography ........... ..........5 <br />Loadout Area Postmining Topography ..................5 <br />