Laserfiche WebLink
Il <br />DAM CONSTRUCTION CERTIFICATION <br />\c <br />1, Stephen R. Hinkemeyer, a Registered Engineer In the State of Colorado, <br />In accordance with 2 CCR 407 -2. Section 4.05.6(7). certify that the East Taylor <br />Pond was inspected by me during construction. I certify that the embankments <br />and spillways were built in accordance with the submitted design drawings. <br />Construction of this dam was begun on September 11. 1995 and was completed on <br />October 20.1995. During construction, this dam was Inspected daily to Insure <br />compliance with prudent construction methods. Compaction was accomplished by <br />1.,.�61Qi11iLarial In thin horizontal layers and compacting with scrapers and <br />v Stephen R. Hink <br />Colorado PE No. <br />Date <br />,c,ti <br />PRIMARY SPILLWAY DISCHARGE = 6937.0 <br />lL� <br />EMERGENCY SPILLWAY <br />,O <br />-,,j <br />J <br />rQ <br />! <br />' <br />Ur <br />g <br />90TTOW OF SPILLWAY ELEV. = 6954.0 <br />TOP OF STANDPIPE ELEV. = 6952.0 <br />GATE VALVE INLET ELEV. = 6941.8 <br />E <br />1�".. <br />RECEIVFG <br />OCT 2 4 1995 <br />Divisiorn of Minerals & Geology <br />COLD X 10 U OAL COYPANY L.P.. <br />I <br />E'AS'T TAYLOR POND <br />A SBU11,T <br />Drawn: -Scale. � <br />GSR�1 "= 30' Section /umber <br />Class: OPermit <br />Section /Exhibit: _ <br />- _._._._._._._._._. <br />i— - Class: O Revision <br />D -aTe: ChecT — !I_Type/Seq: <br />I SRH Class:O Report ro OGeneral / <br />23 Oct 95 Doc Type: _ _ _r A�1-- _`�------------ - - - - -- <br />OApplication ( oal onlyi and O Enforcement Cl Inspection <br />111111 INII IINI VIII (IIII IIII I I1 IIII <br />006770 <br />