Laserfiche WebLink
~ ~ I II II III III IIIIIII I <br /> <br /> ~Tt~T ~ CJF COLORADO <br />DIVISION OF MINERALS AND GEOIp¢Y <br />Depanmenl of Natural Resources <br />1311 Sherman SI., Room ? I S <br />Denver, Colorado 80203 <br />DIVISION OF <br />Phone: 1303) 866-3567 M l N E R A 15 <br />FAX: 1303) 8328106 & <br /> GEOLOGY <br /> R E C L A M A T I O N <br /> MINING•SAFE7Y <br />April 27, 1999 <br /> Bill Owens <br /> Governor <br />Mr. Chuck Murphy Greg E. warner <br />ACA Products Executive Director <br />702 Gregg Dr. Micnael B. tong <br /> <br />P.O. Box 1887 Division Director <br />Buena Vista. CO 8121 t <br />Re: Pine Ridge Pit, Permit No. M-98-104, Permit Issuance -Construction Material Operation <br />Dear Mr. Murphy: <br />On Apri127, 1999 the Division of Minerals and Geology found ACA Products to have satisfied the applicable <br />requirements of C.RS. 34-32.5-101 ~ egg. for obtaining a mining and reclamation permit. Therefore, a permit <br />is being issued. Two signed originals of the permit have been executed. We have kept one copy for our files <br />and are enclosing one copy for your use. [t is your responsibility to comply w~[h all of the terms of the permit. <br />1. All of the original application materials, as amended and supplemented, aze an integral part of your <br />pemlit. They have been incorporated into the permit by reference. We presume that you have a copy of all of <br />these materials; therefore, none have been enclosed with this mailing. We suggest that you keep a copy of the <br />permit and the pemvt apphcation at the mining operation as a reference for operating personnel, to help ensure <br />compliance with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those described in the permit may <br />require a modification to the permit. We suggest consulting the Construction Materials Rules and Regulations <br />and/or contacting us to determine if a revision to the permit is necessary. Rule 1. l0 pertains to Amendments, <br />Rule l.9 to Technical Revisions, and Rule I.1 l to Conversions. <br />3. On your permit anniversary date each year, April 27, you must submit an annual fee and an annual <br />report to us. The annual fee for this permit is $»0.00. Please consult the Act. Rules and Regulations, and your <br />permit for specific annual report requirements applicable to your mine. <br />[f you have any questions, please the contact the Division. <br />Sincere) . <br />MIC L B. <br />Division Director <br />MBL/ESC/BDC <br />Enclosure <br />A1.`OSSBDCITEA~\IAT_sI W Esr <br />