Laserfiche WebLink
~/~~ <br />.- <br />i III IIIIIIIIIIIIIIII • <br />ini ~ vF COLOIZ~DO <br />Roy Romer, Governor <br />Patti Shwayder, Acting &eculive Director <br />Dedicated to protecting and impn~ving the health and environment olthe people o/Colorado <br />4300 Cherry Creek Dr. S. <br />Denver, Colorado 80222-1530 <br />Phone (303) 692-2000 <br />September 20, 1995 <br />Laboratory Building <br />4210 E. 11th Avenue <br />Denver, Colorado 80220-3716 <br />1303) 691-4700 <br />Ms. Nancy A. Comer-Baker, Office Manager <br />M & M Mining <br />P.O. Box 388 <br />Fairplay, CO 80440-0388 <br />SFp ~~~ OFD <br />°%~~s; 1995 <br />°~ of NgnO,~dlS ~ GAD/0 <br />9Y <br />OF COQ <br />ti~ 9 <br />„~% \~~ <br />. ~ . <br />R <br />~ rB'!6 ~ <br />Colorado Deparunent <br />of Public Health <br />and Environment <br />Certified Mail No. P 221 569 302 <br />Re: Stormwater Management Requirements <br />Snow Bird Mine, CDPS Permit Certification Number COG-370012 <br />Park County <br />Dear Ms. Comer-Baker, <br />The Water Quality Control Division (the Division) has received a complaint that stormwater runoff <br />from your operation may be causing a water quality problem, specifically with regard to spilled <br />diesel fuel. As a first step in investigating this allegation, we would like to review the Stormwater <br />Management Plan (SWMP) for the Snow Bird Mine. <br />Your Colorado Discharge Permit System (CDPS) permit, referenced above, includes a requirement to <br />control stotmwater discharges associated with mining activities at your site. The primary stormwater <br />requirement is that you develop and implement a SWMP (see section I.D. of the permit on page 5). <br />The contents of the SWMP are specified in the permit (see pages 6 and 7) I have enclosed a copy of <br />the general permit for your reference. <br />Section I.D.4. states that this SWMP must be provided to the Division upon request, within the time <br />frame specified in the request. This letter is a formal request for submittal of the Snow Bird Mine <br />SWMP. Please submit your SWMP to this office by October 13, 1995. <br />ARer review of the SWMP, we will contact you to schedule an inspection of the site. <br />