Laserfiche WebLink
Figure 6-11. Raise boring of the tunnel ventilation shaft <br /> required the construction of a small hoist house <br /> and headframe. <br /> 6-59 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII <br /> 23142 <br />