Laserfiche WebLink
<br />COLORADO <br />llEPARTMENT <br />OF~HEALTH <br />ROY ROMER <br />Govemar <br />IOEL KOFQJ <br />Imerim Executive Director <br />u Io EmI I I m avenue <br />Denver. COloreAo 80220-3716 <br />Phone (3031320.8333 <br />r ~~~~ III IIIIII1111111III <br />`~ ~. <br />May s, lssl ~~~r1 3 X997 <br />R ned <br />~Qtafiat;o~ and <br />Mr. Cary Stubblefield, Vice President -Operations ~~V~Slpn <br />Trapper Mining, Inc. <br />P.0. Box 187 <br />Craig, CO 81626 <br />RE: Facility Inspection <br />Trapper Mining, Inc. -Trapper Mine <br />CDPS Permit No. CO-0032115 <br />Moffat County <br />Dear Mr. Stubblefield: <br />Talefu Nmilna: <br />Mun BUilanyomw, Fhclosed is your copy of the report forms for the inspectien conducted <br />(3N1DY2-9W6 <br />at the above-referenced facility on January 23, 1991. The on-site <br />Pnrmi6m Plas~ororer <br />(10])l3?132q representative was Mr. William Agnew. During the inspection, the <br />fimNaumJ Back BwlEwa/Denvar following item was noted and needs to be brought to your attention: <br />(!07)1334339 <br />cr>,w waawaomn: 1. The flow monitoring device used at 002 is inaccurate. The effluent <br />()o3)z9a.7(9e appeared to be flawing at a rate of about 50 gpm, but was measured <br />st 200 gpm. The gage (and the ones at the other discharge points) <br />will need to be checked and calibrated. Verification of this work <br />should be submitted to our office by June 7, 1991. <br />Thank you for your time and cooperation. If you have any questions, <br />please call me at 331-4596. <br />Sincerel;-, <br />~~ ~ <br />~,~ < ;~~ <br />1{athryn Dolan <br />Engineering Technician <br />Permits and Enforcement Section <br />WATER QUALITY CONTROL DIVISION <br />Enclosures <br />xc: Sharon Ferdinandsen, Field Support, WQCD <br />Mined Land Reclamation Division <br />District Engineer, Field Support, WQCD <br />Local Health Dept. <br />EPA, Permit Section <br />MS-3 File <br />r, P~k,d~ra.ry~,.~,~.. <br />