Laserfiche WebLink
III IIIIIIIIIIIII III <br />E~~A <br />S Coal Company <br />Seneca Coal Com <br />ACT 2 5 1996 <br />DIVI61d11 dt Mltltlraltl d OBbId9Y <br />Ms. Erica Crosby <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />October 22, 1996 <br />RE: Seneca II-W Mine (C-82-057) Quarterly Stockpond Inspections <br />Dear Ms. Crosby: <br />Enclosed are copies of the third quarter stockpond inspections <br />for those structures at Seneca II-W which have been constructed <br />in this quarter. These are the first set of stockponds to be <br />constructed at the Seneca II-W mine. Inspections for stockponds <br />T-1, T-2, T-3, T-7, T-22 and T-24 are included. All conditions <br />appeared stable and acceptable. The 'as-built' certifications <br />will be submitted as soon as possible, since the field surveys <br />are currently being done on these stockponds with our new GPS <br />equipment. <br />Should you have any questions, please do not hesitate to call. <br />sincere <br />Enclosure(s) <br />c: Dennis Jones (SCC) <br />Gary Wendt (PWCC) <br />v": <br />~ha ~~G. A~l~tav <br />Eng <br />P.E. <br />OCT 2 2 1996 <br />Seneca Caal Company • P.O. Drawer D • Hayden, Colorado 81639 <br />Telephone (970) 276707 • FA7( (970) 276.3014 <br />