Laserfiche WebLink
s <br />'Culvert C-5-1-- <br />.1 Concrete FluiY,_. IU —ex <br />POND A <br />PLAN VIEW <br />SCALE I' = 40' <br />5600 <br />5598 <br />5596 <br />5594 <br />5592 <br />5590 <br />5588 <br />5586 <br />EFFECTIVE EMBANKMENT WIDTH >10' <br />AT FULL WATER LEVEL PLUS 1' FREEBOARD <br />AVG SLOPE <br />3.4H:1.OV <br />WATER EL. 5598 <br />FLOWING FULL <br />CONCRETE EMERGENCY SPILLWAY <br />FRONT OF EC I AVG SLOPE <br />EMBANKMENT 2.OH:1.OV <br />AVG SLOPE <br />2.0H:1.OV <br />--- y 4• VALVED DEwATERING PIPE 1.5 BOTTOM EL. 5587.4 <br />' <br />SEDIMENT POND A <br />HOKIZONAL SCALE 1' <br />= 20' <br />CAnoN <br />VERTICAL SCALE 1" <br />= 4' <br />/,��EZIGMn� <br />5599.9 _ <br />this drawing was done <br />e� presented and <br />a N oa presented best this <br />In true t to the beat of <br />a and *' <br />a <br />� <br />� 7 3/ <br />FULL FLOW LEVEL <br />s' IN FROWARD <br />4 <br />• es E. Storer : W�� ate <br />�4,ado p.E. lre3p t, <br />- - - - -- EL. 5598- - - - <br />- -- <br />1.0' rf.0e DRprX <br />-;�i0�i• <br />'' <br />RECEIVED <br />15 <br />'AUG 02 20 <br />EMEGENCY SPILLWAY <br />DETAIL <br />`\5599 <br />4 <br />POND A <br />HORIZONTAL SCALE 1" = 4' <br />VERTICAL SCALE 1" = 2' <br />COAL RIDGE NO. 1 MINE <br />5 <br />POND A — AS —BUILT <br />- <br />_ -- �5 .8 • <br />5586.6 <br />l <br />2788 Compaae Dr_ Suite IDJ <br />Grand Jet.. CO 81508 <br />ei <br />DRAWN BY APPROVED BY CONTRACT NUMBER <br />J.E.S. <br />I. TR -17 Adequacy No. 1 <br />JES 7/27/00 <br />DATE SCALE SHEET NUMBER <br />No REVISION <br />Missile <br />HY DATE <br />5/00 AS NOTED FIG. 4.3 -6 <br />r <br />� <br />i <br />Valved Dew tering Pipe <br />i; <br />_.. <br />- <br />''�1 8' <br />Staff Gua 8 e <br />Riprap <br />° <br />s <br />55874 <br />1 <br />V <br />, <br />s <br />s <br />'Culvert C-5-1-- <br />.1 Concrete FluiY,_. IU —ex <br />POND A <br />PLAN VIEW <br />SCALE I' = 40' <br />5600 <br />5598 <br />5596 <br />5594 <br />5592 <br />5590 <br />5588 <br />5586 <br />EFFECTIVE EMBANKMENT WIDTH >10' <br />AT FULL WATER LEVEL PLUS 1' FREEBOARD <br />AVG SLOPE <br />3.4H:1.OV <br />WATER EL. 5598 <br />FLOWING FULL <br />CONCRETE EMERGENCY SPILLWAY <br />FRONT OF EC I AVG SLOPE <br />EMBANKMENT 2.OH:1.OV <br />AVG SLOPE <br />2.0H:1.OV <br />--- y 4• VALVED DEwATERING PIPE 1.5 BOTTOM EL. 5587.4 <br />' <br />5600 <br />5598 <br />5596 <br />5594 <br />5592 <br />5590 <br />5588 <br />— — <br />5586 <br />SECTION A — <br />A' <br />SEDIMENT POND A <br />HOKIZONAL SCALE 1' <br />= 20' <br />CAnoN <br />VERTICAL SCALE 1" <br />= 4' <br />/,��EZIGMn� <br />this drawing was done <br />e� presented and <br />a N oa presented best this <br />In true t to the beat of <br />a and *' <br />a <br />� <br />� 7 3/ <br />FULL FLOW LEVEL <br />s' IN FROWARD <br />4 <br />• es E. Storer : W�� ate <br />�4,ado p.E. lre3p t, <br />- - - - -- EL. 5598- - - - <br />- -- <br />1.0' rf.0e DRprX <br />-;�i0�i• <br />'' <br />RECEIVED <br />15 <br />'AUG 02 20 <br />EMEGENCY SPILLWAY <br />DETAIL <br />Division of Minerals& <br />eolo;4CIG FINANCIAL, INC. <br />POND A <br />HORIZONTAL SCALE 1" = 4' <br />VERTICAL SCALE 1" = 2' <br />COAL RIDGE NO. 1 MINE <br />POND A — AS —BUILT <br />J. E. STOVER & ASSOCIATES <br />2788 Compaae Dr_ Suite IDJ <br />Grand Jet.. CO 81508 <br />ei <br />DRAWN BY APPROVED BY CONTRACT NUMBER <br />J.E.S. <br />I. TR -17 Adequacy No. 1 <br />JES 7/27/00 <br />DATE SCALE SHEET NUMBER <br />No REVISION <br />Missile <br />HY DATE <br />5/00 AS NOTED FIG. 4.3 -6 <br />