My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO23816
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO23816
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:44:09 PM
Creation date
11/20/2007 4:06:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
Hydrology
Doc Date
3/13/2002
Doc Name
AUTHORIZATION TO COMMENCE INJECTION
From
US ENVIRONMENTAL PROTECTION AGENCY
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiiiiiiiniii~ii <br />999 <br />_ySFD Srgr~. <br />J Fr~.,'r=UNITED STATES ENVIRONMENTAL PROTECTION AGENCY <br />' REGION 8 <br />~~/~ ~ ~d ; 7 VnG~ 999 18'" STREET -SUITE 300 <br />~M/ DENVER, CO 80202-2466 <br />http:/Iwww.e pa.g ov/regi on08 <br />MAR ~ 2 2~Z <br />Ref: 8P-W-GW <br />CERTIFIED MAIL <br />RETURN RECEIPT REQUESTED <br />Mr. Robert Miller <br />American Soda, L.L.P. <br />2717 County Road 215 <br />Parachute, CO 81635 <br />Re <br />Dear Mr. Miller: <br />RECEIVED <br />MAR 1 3 Zpp2 <br />Division of Minerals and Geology <br />Doc • Na~~ <br />AUTHORIZATION TO COMMENCE INJECTION <br />Well No. 29-68 <br />EPA Area Permit No. C03858-00000 <br />EPA Well No. 0004578 <br />Rio Blanco, Colorado <br />Thank you for submitting information regarding completion of <br />your Well No. 29-68 injection well to the Region VIII Ground <br />Water Program office of the Environmental Protection Agency <br />(EPA). Under Part II Section C.1. "Prior To Commencing <br />Injection" of UIC Area Permit No. C03858-00000 (the Permit), <br />injection operations may not commence into any newly drilled or <br />converted well(s) until the Permittee has received written <br />authorization from the EPA as to the following: <br />1. Construction is complete and the Permittee has <br />submitted information to the Director that includes EPA <br />Form 7520-10, a schematic well bore diagram after <br />construction, and detailed drilling, construction and <br />cementing records including any open hole tests; and <br />2. copies of all pertinent logs run during the drilling <br />and completion of the well including a Cement Bond Log <br />(CBL), accompanied by a narrative interpretation by a <br />knowledgeable log analyst, have been submitted; and <br />3. the mechanical integrity of the well has been <br />demonstrated and the results of a successful pressure <br />mechanical integrity test submitted; and <br />4. formation data and injection fluid analyses have been <br />submitted. <br />~Pdnfed on Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.