Laserfiche WebLink
"' d' ' , <br />T , <br />V <br />BATTLE MOUNTAIN RESOURCES, INC. ~j,Z <br />December 11, 2006 <br />Mr. Allen Sorensen <br />State of Colorado <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Re: Battle Mountain Resources Inc. <br />San Luis Project <br />CppffLRB Permit No. M-88-112 a/ <br />vl4ovember 2006 Monthly Report <br />Dear Mr. Sorensen: <br />R 1I~ ~ ~ <br />The following summarizes monitoring and site activities at the Battle Mountain Resources Inc. <br />(BMRI), San Luis Project for the month of November 2006. <br />Surface and ground water monitoring and analysis were completed for all required sites during <br />the month per the terms and conditions of the TR-32 Quality Assurance and Quality Control <br />(QA/QC) plan. <br />Vacuum on the tailing lysimetets was verified on November 29m, no water was present for <br />sampling and subsequent analysis. <br />Depths to water were collected for the tailing impoundment main embankment piezometers and <br />the West Pit and tailings embankment monitoring wells on November 29th. November tailing <br />impoundment piezometer measurements identiFed these installations were either dry or contained <br />less than 12 inches of water as i]lustrated in Table 2. Tables 1 and 2 below identify the depth to <br />water measurements collected for each of the site monitoring wells, piezometers and lysimeters as <br />required by the terms and conditions of the TR-32 QA/QC plan. <br />The tailing impoundment collection pond underdrain flow was pumped intermittently during the <br />month to minimize the collection pond level. The leak detection system was measured on <br />November 29`". The November tailings pond underdrain flow average was 42.69 gpm and a total <br />of 830 gallons of water was excavated from the leak detection system yielding a monthly average <br />of 27.66 gpad. <br />During November the West Pit water treatment plant operated efficiently dischazging a total of <br />8,873,600 gallons (27.23 acre-feet) of water to Rito Seco Creek and a total of 617,800 gallons <br />(1.90 acre-feet) of water was transferred from the water treatment plant to the tailings <br />impoundment. Seepage along Rito Seco Creek remained dry during the month. <br />P.O. Box 310 San Luis, Colorado 81152-0310 (719) 379-0798 Fax (719) 379-0713 <br />