Laserfiche WebLink
iii iiiiiiiiiiiu iii <br />999 <br />QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.6(13) <br />Mine: R~ Cr~~.~ /~lr~7P Permit No: C-8z -D,sS" <br />NPDES ID. No.: pd~ <br />Inspection Period: Z.~o QT~2 LcoO <br />Inspection Date: ,.l ~. ~ e _ Z,~ Z.eoo <br />General Description or Reference to Site Plan: <br />/twfti„~ GJ wt.a~ YNt~t2 Sc~-- /s frf ecw t~~u-~ G/ r~H~ ~'~`~" <br />77;x- S¢dtw~~ ~,~-,eQ /rrs L,.e-sLR.o~o~a' a~~r.,... ~S'~- o~~s~- <br />p~csPosQ-Q acI cc~ . <br />EMBANKMENT <br /> <br />1). Adequacy of the vegetative cover: elle Moderate Few Poor <br />2). Erosion forming Gullies: Extensive Some Few <br />3). Is wave action causing erosion: <br /> On the Upstream embankment? Yes No L <br /> Al the principal spillway inlet? Yes No rr <br />4). Erosion of the downstream toe of the embankment? Yes No ~ <br /> Cause of erosion can be attributed to: <br />5). Is seepage occurring through the dam? Yes No `- <br /> otent <br />ia <br />l instability? <br />Could this seepage//lc~ause p <br /> A <br />~ <br />q <br />i'1/b ,1/isc.~t~X r,:i.~l~~.L!"r.r.,-. df 4cel parda <br />PRINCIPAL SPILLWAY <br />1). Is the principal spillway system in working order? <br />2). Is the'i;nletfcee of debris and restrictive material? <br />i ~ ~-. <br />3): Is the dlsc'ttarge outlet free of restrictive material <br />4). Is erosion ,occurring at the discharge outlet? <br />.Evaluate'.ftle severity: Extensive Moderate <br />.. ... i , <br />'1 <br />Yes ~ No <br />Yes ~- No <br />Yes ~ No <br />Yes No ~ <br />Just starting None <br />Page 1 of 2 <br />