Laserfiche WebLink
:. <br />September 24, 2001 <br />Mr. AI Weaver <br />Energy Fuels Coal, [nc. <br />P. O. Box 459 <br />Florence, CO 81226 <br />Deaz AI: <br />Re: Raton Creek Mine <br />Quarterly Sediment Pond Inspection <br />Certification of Quarterly Inspection <br />~ : ~G r <br />III IIIIIIIIIIIIIIU <br />Ronald G, Thompson <br />Peak Project Management <br />3800 County Road 63.9 <br />Trinidad, Colorado 81082 <br />(719) 846-2427 <br />RECEIVEp <br />OCT 1 ~ 2001 <br />Division of Minerals ,5 Geology <br />On September 22, 2001, the sediment control pond at Raton Creek was inspected for structural integrity, <br />erosion, hazardous conditions, and to identify required maintenance. The inspection also satisfies Rule <br />4.05.9 (13) of the Colorado Mined Land Reclamation Boazd for Coal Mining. <br />To the best of my knowledge, based upon my field observations and investigations, as detailed in the <br />attached inspections report, the referenced pond is being maintained in conformance with prudent, state-of- <br />the-art earthen embankment construction. <br />Sincerely, <br />Ronald G. Thompson <br />MSHA Certified -Impoundment Inspections <br />I have reviewed these reports and certify that a quali£ed person under my direction has inspected these <br />i ,~ <br />-~ ChatJe: <br />= " Coloia <br />,: <br />r <br />'~i "~~ <br />.. ~~ <br />r. McGlothlin, P. E. <br />Registration No. 25832 <br />