Laserfiche WebLink
III IIIIIIIIIIIII III <br />999 ~, <br />~~~~~ <br />(J~' ~ Illa~n. <br />n~ I <br />l,~i~" Pond_ <br />J L_ <br />JAN 3 01997 °-- <br />BASIN RESOURCES, INC. <br />SECZIN~F~NTATION POND INSPECTION FORM <br />.. VC ~u <br />Date of Inspecti <br />PDES No. 4D Z Z~~ 2.3 <br />EMBANKMENT <br />1. Adequacy of the vegetative cover: Excellent, ~'' toderate, Few, <br />2. Erosion forming gullies: Extensive, Some, ery Few, <br />3. Is wave action causing erosion: <br />On the upstream embankment? Yes <br />At the principal spillway inlet? Yes <br />4. Erosion of the downstream toe of the embankment? Yes <br />The cause of the erosion is attributed to: <br />~. Is s:; page occ;unng through the dam? Ya _ <br />Co:dd ;his seepage cause potential instahiliry? Yes _ <br />E.~cplain: _ __ <br />PRINCIPAL SPILLWAY <br />1. Is [he pnncipal spillway system in working order? Yes <br />2. Is the inlet free of debris and restrictive material? ~LP~ L/n e- Yes <br />(~ L J ri"L ~~ O <br />3. Is the discharge outlet free of restrictive material? Yes <br />v <br />Poor <br />None <br />No ~' <br />No ~ <br />No v <br />Nv ~! <br />No _ <br />No <br />No <br />/~ No <br />4. Is erosion occurring at the discharge outlet? Yes No / <br />Evaluate the severity: Extensive Moderate Just Starting; None <br />EMERGEIVCY SPILLWAY <br />1. Is the overall emergency spillway ystem capable of passing design storm discharge? <br />Yes e~ No <br />2. Does it appear as if the emergency spillway has discharged water since the last inspection? <br />Yes No ~~ <br />3. Is erosion occurring at any section of the emergency spillway? Yes No ~~ <br />Describe the extent: <br />SEDIMENT STORAGE CAPACITY <br />1. Has the design storage capacity of the reservoir been surpassed? Yes <br />J F ~/ ~r.S L'tW~'-~ <br />Z~ is S'~S durt~- <br />lease add auy special comments conce g potential y dangerous roblems oo the backyf this <br />sheet! ,(~J ~e~ <br />Inspected by: ~.~" <br />