Laserfiche WebLink
BATTLE MOUNTAIN RESOURCES, INC. <br />October 8, 2004 <br />Mr. Tony Waldron <br />State of Colorado <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Re: Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />September 2004 Monthly Report <br />Dear Mr. Waldron: <br />RECEI V~p~ <br />OCT~y~ <br />Division of Minerals and Geology <br />The following summarizes monitoring and site activities at the $attle Mountain Resources Inc. <br />(BMRI), San Luis Project for the month of September 2004. <br />Surface and ground water monitoring and analysis were completed for all required sites during <br />the month per the terms and conditions of the TR-32 Quality Assurance and Quality Control <br />(Q~QC) Plan. <br />Vacuum on the tailing lysimeters was verified on September 24`h, no water was present for <br />sampling and subsequent analysis. <br />Depths to water were collected for the tailing impoundment main embankment piezometers on <br />September 29t°, and the West Pit and tailings embankment monitoring wells on September 30`h. <br />The September 29`h tailing impoundment piezometer measurements identified these installations <br />were either dry or contained less than 12 inches of water as illustrated in Table 2. Tables 1 and 2 <br />below identify the depth to water measurements collected for each of the site monitoring wells, <br />piezometers and lysimeters as required by the terms and conditions of the TR-32 QA/QC plan. <br />The tailing impoundment collection pond underdrain flow was pumped intermittently during the <br />month to minimize the collection pond level. The leak detection system was measured on <br />September 29th. The September tailings pond underdrain flow avemge was 30.22 gpm and a total <br />of 530 gallons of water was excavated from the leak detection system yielding a monthly average <br />of 18.27 gpad. <br />During September, the West Pit water treatment plant operated efficiently discharging a total of <br />8,157,000 gallons (25.03 acre-feet) of water to Rito Seco Creek and a total of 461,400 gallons <br />(1.42 acre-feet) of water was transferred from the water treatment plant to the tailings <br />impoundment. Seepage along Rito Seco Creek remained dry during the month. The monthly <br />precipitation accumulation for September was .41 inches, with the largest accumulation occurring <br />on September 19th (.33"). <br />P.O. Box 310 San Luis, Colorado 81152-0310 (719) 379-0798 Fax (719) 379-0713 <br />