Laserfiche WebLink
III IIIIIIIIIIIII III <br />999 <br />blue <br />ribbon blue ribbon coal company <br />coal ECE~~ED p.o. box 58 <br />delta, colo ratio 81416 <br />company R gut 1 ~ 1984 (303) 874-7561 <br />M1NE~ UeP4 t N Mpa1 Re ouv ce1s ~u 1 y 9 , 1984 <br />Mr. Robert Liddle ~p10 <br />Reclamation Specialist <br />Colorado Mined Land Reclamation <br />1313 Sherman Street, Room 423 <br />Denver, CO. 80203-2273 <br />RE: File # C-047-81, Drainage System Repairs <br />Dear Bob: <br />As a follow-up to our phone conversation on June 28, 1984, <br />this letter is to verify that drainage control was re-established <br />by end-of-day June 28, 1984. Subsequent to our discussion, the <br />embankment on Pond #4 was completed and the discharge structures <br />were established to their proper relative elevations. <br />Other drainage taken care of since your inspection June 21st <br />include: <br />o a 12" culvert was installed from the lower stockpile to <br />Pond #4; <br />o a collection ditch was installed between the lower stock- <br />pile and the road; <br />o drainage was re-established over the bridge and behind the <br />guard house into Pond #4; and <br />o drainage was re-established along the road leading to Pond #1. <br />Another item discussed was the topsoil concern expressed by <br />OSM. Straw was spread on the topsoil stockpile behind the coal <br />pile on June 28th, and a straw dike was placed along the southern <br />edge of the topsoil stockpile near Pond #1 on June 26th. Planting <br />of these areas is scheduled for the fall of 1984. <br />If you have any questions, please feel free to contact me. <br />Very truly yours, <br />~~n~ 5. I ~ <br />.~ Larry M. Reschke <br />Mine Engineer <br />LMR:KES <br />cc: W. S. Tate <br />