My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO23269
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO23269
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:43:51 PM
Creation date
11/20/2007 3:39:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999051
IBM Index Class Name
Hydrology
Doc Date
7/12/2001
Doc Name
Revised Project Schedule
From
Natural Soda Inc.
To
DMG
Permit Index Doc Type
Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br />JU! 12 2001 <br />Natural Soda, Inc. <br />818 Taughenbaugh Blvd. <br />Rifle, Co. 81650 <br />Division of Minerals and Geology <br />PO Box1330 <br />Phone:970-625-9124 <br />Fax: 970-625-9137 <br />Email rocksch(c~sopris.net <br />July 11, 2001 <br />Mr. Larry Shults <br />Environmental Coordinator <br />White River Field Office <br />Bureau of Land Management <br />73544 Hwy 64 <br />Meeker CO 81641 <br />Mr. Allen C. Sorenson ~ <br />Environmental Protection Specialist <br />Division of Minerals and Geology <br />1313 Sherman St., Room 215 <br />Denver CO 80203 <br />m I~a~t~Sl <br />reu ; ied- Pro J ~-- 5cl~t~~[,c~ 2 <br />555 <br />Mr. D. Edwin Hogle <br />Director-Groundwater Program <br />US Environmental Protection Agency <br />999 18s' Street, Suite 500 <br />Denver CO 80202-2466 <br />Dear Sirs: <br />Surface and ground water have been monitored since January 2000 at the Rock School <br />Lease following the protocol specified in Table 1 a of our approved November 1999 <br />`Surface and Groundwater Monitoring Plan.' With the June 2001 sampling period, a <br />total of 18 months' {six successive calendar quarters) of data have been collected. You <br />have been sent reports of the sampling results through February 2001 (five successive <br />calendar quarters.) Subsequent monthly data reports will be sent to you as soon as they <br />are completed. <br />Sufficient data have been collected to adequately characterize baseline conditions for <br />surface and ground water at the Rock School Lease. Based on your comments during <br />the sampling and reporting period, we assume you also feel the data adequately <br />characterize baseline conditions. We therefore are halting the baseline sampling with the <br />June 2001 sampling period. Operational surface and ground water monitoring will be <br />started one month prior to plant start-up. This monitoring will follow the approved <br />protocol specified in Table lb of the above referenced monitoring plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.