Laserfiche WebLink
~~ ~ i <br />III III IIIIII IIII III <br />f~I~A~~O ^ 999 <br />s c%"omE Pe~ny\ Seneca Coal Company <br />°'~ , <br />~.~,,~ <br />:, RFrFIVFU <br />APR ~ 2 1996 <br />Apri 1 9 , 199~IVisiOn of Mmeral~ & (3oviugy <br />Mr. Joseph Dudash <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />RB: Quarterly Sedimentation Pond Inspections - Hayden Gulch <br />Loadout <br />Dear Mr. Dudash: <br />Per our phone conversation earlier today enclosed is another set <br />of the first quarter inspection reports for Ponds 001 and 002 at <br />the Hayden Gulch Loadout. All conditions appeared stable and <br />acceptable. I apologize for any inconvenience for not being able <br />to read the initial copies. <br />If you have any questions, please call me. <br />Si <br />~~ <br />MicH <br />Engi <br />Enclosure(s) <br />APR 0 9 1996 <br />Seneca Coal Company P.O. Drawer D Hayden, Colorado 81639 <br />Telephone (970) 276-3707 ` FAX (970) 276-3014 <br />