My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51056
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:19 PM
Creation date
11/20/2007 2:44:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977071
IBM Index Class Name
Permit File
From
KASLER CORP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~as~er <br />~ior~po~tion <br />iiiiiiiiiiuiiiim~ • <br />.~. ~. ~oo~s ~ sons, ~nc. <br />3]000 E.ST FIFTH STREET <br />P.O 60% JB> <br />5>N gER N!•RDIN O, CALIFORNIi 92e02 <br />TELEPHONE TIO~BBe CB11 <br />TW I. 91D~3]2~1231 <br />~Q~ <br />GENERAL ENGINEERING CONTRACTORS <br />The principal components of the work to be preformed include the <br />following: <br />(a) Construction of Valve Structure No. 1 with steel pipe for con- <br />nection to existing outlet works conduit from Sugar Loaf Dam and <br />Reservoir. The valve structure will contain valves, recording <br />facilities, and a wasteway with baffled outlet. <br />(b) Construction of approximately 10.E miles of Mt. Elbert conduit, <br />a 90-inch diameter pipe connecting Valve Structure No. 1 and an <br />existing baffled apron drop into Mt, Elbert forebay dam reservoir. <br />(c) Construction of approximately 0.5 mile of Leadville fish hatchery <br />conduit, a 21-inch-diameter pipe connecting the Leadville fish <br />hatchery turnout to be located on the Mt. Elbert conduit and Valve <br />Structure No. 2. <br />(d) Construction of Valve Structure No. 2 with a regulating tank, control <br />system, -valves, and recording facilities to regulate and record flows <br />into two ponds and an existing pipeline to the Leadville fish hatchery. <br />(e) Construction of Halfmoon diversion structure consisting of drop in- <br />let, sluice pipe, bypass, abutment walls, and electrical equipment <br />house. <br />(f) Construction of approximately 0.6 mile of Halfmoon feeder conduit, <br />60-inch-diameter pipe connecting •Halfmoon diversion and Valve <br />Structure No. 3. <br />(g) Construction of Valve Structure No. 3~which is the link between <br />Halfmoon feeder conduit and Mt. Elbert conduit. The structure has <br />valves and recording facilities for regulating and recording the flow <br />of water from Halfmoon diversion through Halfmoon feeder conduit into <br />Mt. Elbert conduit. <br />(h) Construction of Halfmoon diversion stream gaging station in Halfmoon <br />Creek near the vicinity of Halfmoon diversion. <br />(i) Furnishing and installing piping, valves, gates, and metalwork nec- <br />essary for constructing the above-named structures. <br />
The URL can be used to link to this page
Your browser does not support the video tag.