My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE50686
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE50686
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:07 PM
Creation date
11/20/2007 2:35:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980047
IBM Index Class Name
Permit File
Section_Exhibit Name
EXHIBIT L RECLAMATION COSTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiiniiiiiiuiii <br />~- <br />EXHIBIT L <br />RECLAMATION COSTS <br />The following presentation of estimated costs fot the total re- <br />clamation of the Colony project is broken down into three phases. <br />(1) demolition, (2) facilities revegetation and (3) processed <br />shale revegetation. The acreages involved for each aspect are <br />presented. The costs of all revegetation were broken down <br />between material costs and labor costs. <br />This estimate assumes removal of all structurals to 10" below <br />ground level, with items below this level left buzied. The flood <br />control dams, feeder power lines, and a portion of the river water <br />structure will remain for use by others. This estimate was prepared <br />•in 1979 dollars. <br />Table L-1, the demolition estimate, does not include any costs <br />for revegetation of these acres. These figures are presented <br />on Table L-2. The costs for the revegetation and reclamation <br />of the processed shale area are presented on Tattle L-3. <br />The total costs of all reclamation are approximately $92,200,000. <br /> <br />L-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.