Laserfiche WebLink
<br />TRAPPER 1RIpIp6 IpC. <br /> <br />~II ~I~I II~I~ <br />999 ~~II ~I~ <br />January 28, 1993 ~ .~ ,-- , , , <br />~-- ~ , . ~ ~ <br />i. ~,,~. , <br />Mr. Kent Gorham <br />Colorado Office of Mined Land Reclamation <br />215 Centennial Building <br />1313 Sherman Street <br />Denver, CO 80203 <br />Dear Kent: <br />FEB 0 11993 <br />MINERHLS ~ ~" _ _ .: . <br />RE: Trapper Mine Fourth Quarter (1992) Sediment Pond Inspection Report <br />Trapper's fourth quarter sediment pond inspection reports for 1992 are enclosed. All <br />storm event runoff has passed without incident. (Please note that the inspections were <br />actually conducted in January 1993.) <br />Snow cover (6" to 36") precluded a thorough inspection of the embankments and <br />appurtenant structures. All dams appear to be in good condition and are functioning as <br />designed. <br />An inspection report is included for Far East Buzzard Dam No. 1. Construction of this <br />structure was completed during the fourth quarter of 1992. <br />All sedimentation ponds were examined either by me or another qualified person under <br />my direction. <br />Call Forrest Luke or me if you have any questions. <br />Sincerely, ~~ <br />James M. Mattern, P.E. <br />Chief Engineer <br />]MM/mg/MLR128 <br />enc <br />c FlY Luke <br />MW Wehmanen <br />P.0. Box 187 Craig, Colorado 81626 (303) 824-4401 <br />