My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE49244
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE49244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:51:10 PM
Creation date
11/20/2007 1:57:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001063
IBM Index Class Name
Permit File
Doc Date
9/28/2001
Doc Name
OPHIR LODE FN M-2001-063 110 2 APPLICATION REQUEST FOR 2ND EXTENSION OF DECISION DATE
From
DMG
To
MIDAS MINING CO INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iiiiiiiiiiin~«iii <br />999 <br />• • <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman Sl., Room® //''~~ q p <br />PDhoner130.1~~ E-L~6.a E~V' ~~ <br />FAX: 13031 832-8106 ^ Q ~nn~ <br />5Ep L U YV SEP 2 3 2U09 <br />0ip~1 Brats ono- Grolo9l' <br />SeptemDt±lhs~, l0~ 1 Division of Minera4s and Geology <br />Mr. Wayne R. Giesy, President <br />Midas Mining Co., Inc. <br />P.O. Box 772 <br />Plulomath, OR 97370 <br />~f~~~~~i ~ ~~~8~~ <br />~~~ ~~_,B~ E~9~~ C~~~ <br />6~8~~~:=:ems(,- 1 ~olv3 <br />1/ /:7[/'jV ~~a <br />DIVISION OF <br />MINERALS <br />GEOLOGY <br />REC LA RATION <br />MINING•SAFETY <br />Bill Owero <br />Governor <br />Greg E. Walther <br />Executive Dhectar <br />Michael R. Long <br />Division Director <br />Re: Ophir Lode, File No. M-2001-063, 110(2) Application, Request for Second Extension of Decision Date. <br />Dear Mr. Giesy, <br />The Division is in receipt of the written request for a second extension of the decision date for the above-named <br />application. This request is fora 30-day extension in order to allow sufficient time to prepare and submit the <br />required adequacy responses. <br />The present decision date was September 28, 2001. This request for extension has been approved, and the decision <br />date has been reset to October 29, 2001. <br />1 am confirming my appointment for the inspection of the site with Reid Giesy on October 2, 2001. I am confident <br />that we will get many questions answered during the inspection. My arrival time will be about 10:30 a.m., <br />assunung the road over Engineer Pass is in shape. <br />1 will fax this to you, and mail the hard copy today. If you have questions or comments, I may be reached at the <br />Division's Durango field office: 701 Camino del Rio, Room 12~, Durango, CO 81301; tel 970/247-5 l93 or fax <br />970/247-5104. <br />Sincerely, <br />Bob Oswald <br />Environmental Protection Specialist <br />cc: Les Charles, Mine Superintendent, MMCI, 711 N. 1 lth St., Gunnison, CO 81230 <br />a:\ophir appl er102/rco <br />
The URL can be used to link to this page
Your browser does not support the video tag.