Laserfiche WebLink
g M O O ~II ~I~~I~~I~~~~~ ~I~ O Anln B. Hodgsonhl. P.E. <br />O 999 <br />Rindahl8 Associates o o Denver, CO _____ - - <br />2305 S. Syracuse Way, Suite 217 80231 696-6846 <br />April 8, 1983 <br />Mr. Mark Loye <br />Mined Land Reclamation Division <br />1313 Sherman Street <br />423 Centennial Building <br />Denver, CO 80203 <br />Re: Terra Construction, Inc. - Vollmer Pit <br />File No. 83-35 <br />Dear Mark: <br /> <br />H:';~ o I J~`~ <br />Colo. pt. of f10N <br />Natural Resources <br />The following comments correspond to your paragraphs. <br />Fvhihit ~ <br />The permit is located in the S 1/2 SW 1/4 and the SW 1/4 SE 1/4, Section <br />32, Township 12 South, Range 65 West, 6th P.M. <br />Fvh;h;+ r <br />1. The permit boundary is shown on sheet 2 of 2 delineated by the dashed <br />line and labeled "Limits of disturbed area." Sheet 1 of 3 "Pre-mining <br />map" shows property lines and type of soil on the property. Sheet 3 <br />of 3 depicts how the final reclamation contours tie into the existing <br />contours outside of the affected area. <br />Fot clarification, we have attached four copies of sheets 1 and 3 of 3 <br />with the requested information added. <br />2. The 650' road into the mining area was considered a part of the 80 acre <br />affected area. <br />3. Final sloping and contouring will occur after the last phase of mining <br />is complete and after the topsoil stockpile has been removed. <br />~~: <br />Resource Engineering 8 Environmental Services .~~ <br />