My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE48299
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE48299
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:50:16 PM
Creation date
11/20/2007 1:32:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983035
IBM Index Class Name
Permit File
Doc Date
4/26/1983
Doc Name
TERRA CONSTRUCTION INC VOLLMER PIT FN 83-35
From
RINDAHL & ASSOCIATES
To
MLRD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-, :o O 01 O <br />o 101001001000~~ 010 <br />RlnAahl 8 Associates ~ 2305 S. Syracuse Way Suite 217 ~ Denver, CO 80231 ~ (303) 898-6846 <br />April 26, 1983 <br />Mr. Mark Loye <br />Mined Land Reclamation Division <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, CO 80203 <br />Re: Terra Construction Inc. - Vollmer Pit <br />File No. 83-35 <br />Dear Mark: <br />Reference your letter of April 20, 1983. <br />Exhibit C <br />Gilbert F. Rln0ahl, P.E. <br />C. Jey Sllvernale <br /> <br />APR 2 G 1983 <br />MINED LP.ND RECLAMATION <br />Colo. Dept. of Na?!Iral Reseerces <br />3. Reclamation costs in Exhibit L do include the redistribution of the <br />topsoil stockpile. <br />6. Your assumption is correct that mining is not expected to extend to <br />the depth of the unweathered material. <br />9. We mentioned that a berm could be used for sediment control. However <br />that is not the intent. As stated, the soils condition is such that <br />we do not believe a berm is necessary. <br />10. No ponds are required for the asphalt plant. Any spills or leakage <br />will be immediately cleanedup to prevent possible contamination of <br />soils. <br />Exhibit E <br />6. Topsoil will be tested for each reclamation phase. <br />8. See Exhibit L. <br />Resource Engineering 8 Environmental Services <br />~ ac <br />°....•. <br />
The URL can be used to link to this page
Your browser does not support the video tag.