Laserfiche WebLink
iii iiiiiiiiiiiii iii <br />999 <br />E~~A <br />~CoalCompany Seneca Coal Company <br />RECEIVED <br />JUL 16 1997 <br />Division of fvlinerals 8 Geology <br />July 14, 1997 <br />Ms. Erica Crosby <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />RB: Quarterly Sedimentation Pond Inspections - Seneca II Mine <br />Dear Ms. Crosby: <br />Enclosed is the second quarter inspection reports for Ponds 002, <br />003, 004, 008, the PeCoCo Reservoir, Spill Control Pond #2 and <br />both truck wash ponds at the Seneca II Mine. All conditions <br />appeared stable and acceptable. <br />If you have any questions, please call me. <br />Sincerely, <br />28455 <br />Michael G. ~l,tavilla <br />Engineerin ~jagager <br />Enclosure(s) <br />l <br />c: Dennis Jones (SCC) JUL 1 4 1997 <br />Gary Wendt (PWCC) <br />Seneca Coal Company • P.O. Drawer D • Hayden, Colorado 61639 <br />Telephone (970) 276-3707 • FAX (970) 276-3014 <br />