Laserfiche WebLink
111 IIIIIIIIIIIII lll~ <br />999 <br />E~~A <br />S Coal Company Seneca Coal Company <br />December 7, 1995 <br />nr/~~~U~D <br />Ms. Janet Binns DEC 13 1995 <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 -~l'~~~~~~~~~.~~~~erals&GeolDgy <br />RE: Seneca II Mine (C-80-005) Quarterly Stockpond Inspection <br />Dear Ms. Binns: <br />Enclosed are copies of the fourth quarter stockpond inspections <br />for those structures at Seneca II that have been certified. <br />Inspections for Stockponds T-15, T-16, T-25, T-26, T-28, T-30 <br />and T-31 are also included. Construction of these Stockponds has <br />been done, but they require some maintenance work to make them <br />complete. The 'as-built' certifications will be submitted as <br />soon as possible once they are finished. <br />Maintenance work on several of the Stockponds has been completed <br />during the third and fourth quarters. Several Stockponds were <br />unable to be addressed and will be finished next spring. <br />Should you have any questions, please do not <br />Si <br />Mich <br />Engi <br />Enclosure(s) <br />c: Fred Fest <br />Dennis Jones <br />tate to call. <br />Altayi~~a, P.E. <br />DEC 0 71995 <br />~;: <br />~` <br />Seneca Coal Company • P.O. Drawer D • Hayden, Colorado 81639 <br />Telephone (303) 276-3707 • FAX (303) 276-3014 <br />