My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO20012
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO20012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:41:26 PM
Creation date
11/20/2007 1:19:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
Hydrology
Doc Date
10/12/2000
Doc Name
UIC INFO
From
US ENVIROMENTAL PROTECTION AGENCY
To
ROBERT MILLER
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T <br />• ~,~~~,~ <br />~_ ~ <br />~Y <br />III IIIIIIIIIIIII III • <br />UNITED STATES ENVIRONMENTAL PROTECTION AGENCY <br />REGION 8 <br />999 18~" STREET -SUITE 300 <br />DENVER, CO 80202-2466 <br />http://www.epa.gov/reg ion08 <br />Ref: BP-W-GW <br />CERTIFIED MAIL <br />RETURN RECEIPT REQUESTED <br />Mr. Robert Miller <br />American Soda, L.L.P. <br />2717 County Road 215 <br />Parachute, CO 81635 <br />Dear Mr. Miller: <br />OCT 12 2000 <br /> <br />Re: AUTHORIZATION TO COMMENCE INJECTION <br />Well No. 20-31 <br />EPA Area Permit No. C03858-00000 <br />EPA Well No. 0004558 <br />Rio Blanco, Colorado <br />Thank you for submitting information regarding completion of <br />your Well No. 20-31 injection well to the Region VIII Ground <br />Water Program office of the Environmental Protection Agency <br />(EPA). Under Part II Section C.1. "Prior To Commencing <br />Injection" of UIC Area Permit No. C03858-00000 (the Permit), <br />injection operations may not commence into any newly drilled or <br />converted well(s) until the Permittee has received written <br />authorization from the EPA as to the following: <br />1. Construction is complete and the Permittee has <br />submitted information to the Director that includes EPA <br />Form 7520-10, a schematic well bore diagram after <br />construction, and detailed drilling, construction and <br />cementing records including any open hole tests; and <br />2. copies of all pertinent logs run during the drilling <br />and completion of the well including a Cement Bond Log <br />(CBL), accompanied by a narrative interpretation by a <br />knowledgeable log analyst, have been submitted; and <br />3. the mechanical integrity of the well has been <br />demonstrated and the results of a successful pressure <br />mechanical integrity test submitted; and <br />9. formation data and injection fluid analyses have been <br />submitted. <br />~Pnnted on Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.