My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE47010
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE47010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:49:05 PM
Creation date
11/20/2007 1:00:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
pages 2.05-83 to 2.05-166
Section_Exhibit Name
2.05 Operation & Reclamation Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
West Elk Mine <br />(1) Reclamation Timetable <br />Timing and locations of topsoil removal and replacement within the upper refuse disposal and the <br />facilities site are shown on Map 57 and Map 56. It is uncertain at this time however, when (or if) <br />the upper refuse disposal site will be constructed. The timing of topsoil removal and replacement <br />within the lower waste coal disposal site is described in Exhibit 51. <br />Reclamation of the disposal area will begin promptly as each phase of deposition of the refuse coal <br />is completed and will follow the procedures described in the Reclamation Methodology Section <br />and in Exhibit 50 and Exhibit 51. Refuse pile compaction and stabilization, topsoil replacement, <br />and revegetation will occur as portions of the refuse disposal areas aze completed. Disposal in the <br />designated azeas are also discussed in the Reclamation Methodology Section, Exhibit 50, and <br />Exhibit 51: <br />The surface facilities site and other disturbed azeas at the West Elk Mine will be reclaimed as <br />described in the Reclamation Methodology Section. Permanent reclamation of operational azeas <br />will not commence until actual mine operations cease, in approximately 40 years. Table 41A <br />provides a timetable for the major reclamation tasks, other than reclamation of the refuse piles. <br />Removal of the sedimentation.ponds is not included, as they will not be removed until vegetation <br />has been established following completion of the major reclamationtasks. <br />Table 41A Time Tabte for Major Reclamation Tasks <br />1 <br />• <br />1 <br />• <br /> <br />RECLAMATION TASKS APPROXIMATE TIME TO COMPLETE TASK <br />MAIN MINE SITE <br />Remove buildings/structures I6 Weeks* <br />Backfill mine portals & Sylvester Gulch Fan Portal 12 Weeks* <br />Backfill and Grade 16 Weeks <br />Replace topsoil 8 Weeks <br />Seed 2 Weeks <br />LONE PINE GULCH <br />Remove buildings/structures 6 Weeks <br />Backfill fan portals 4 Weeks <br />Backfill and Grade 6 Weeks <br />Replace topsoil 3 Weeks <br />Seed 2 Weeks <br />NORTH SOIL STORAGE AREA <br />Backfill and Grade 6 Weeks <br />Replace topsoil 3 Weeks <br />Seed 1 Week <br />SYLVESTER GULCH FACILITIES AREA <br />Remove buildings/structures 12 Weeks <br />Seal shafrs #1, #2, and #3 12 Weeks <br />Backfill and Grade 16 Weeks <br />Replace topsoil ]4 Weeks <br />Seed 3 Weeks <br />* Tasks could occur concurrently <br />2.05-83 <br />Revised Dec. 1997 MR208; Revised Jun. 1999 TR90 <br />