My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE46614
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE46614
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:48:45 PM
Creation date
11/20/2007 12:51:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Phase IVa H.V. Solution Coll.
From
CC & V
To
DMG
Media Type
M
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />00 1 <br />000 1 <br />z 1 <br />18" DIA. SOLID CPE 1 <br />SOLUTION TRANSFER PIPE 1 <br />(SEE NOTE 6) 1 <br />0 <br />00 <br />APPROXIMATE LENGTH <br />OF INDIVIDUAL PIPE <br />SEGMENT (FT.) <br />0 <br />TYPE <br />LEGEND <br />— — — — — <br />EXISTING LIMITS OF PHASES 1, II AND III GEOMEMBRANE <br />rn <br />o <br />d <br />z <br />Q <br />2,453 <br />BY <br />z <br />■ • � <br />LIMITS OF PHASE N GEOMEMBRANE <br />TRANSITION <br />TO SOLID CPE AT <br />1 -18" DIA. <br />SOLID CPE <br />PRIMARY SOLUTION COLLECTION PIPE <br />PHASE IVa <br />PAD BOUNDARY <br />H4 <br />9550 <br />PROPOSED VALLEY LEACH FACILITY <br />M N O <br />O O <br />1 -8" <br />DIA. <br />PCPE <br />EXPANSION REGRADED CONTOURS <br />KAJ <br />O <br />0 <br />I GE <br />Q <br />SOLUTION TRANSFER PIPE SEGMENT <br />1 -8" <br />DIA. <br />PCPE <br />PRIMARY SOLUTION COLLECTION PIPE SEGMENT <br />801 <br />1 -8" <br />O2 <br />SECONDARY SOLUTION COLLECTION PIPE SEGMENT <br />O <br />609 <br />1 -8" <br />18" DIA. PCPE (ADS N -12 OR EQUIVALENT) <br />PCPE <br />O <br />482 <br />NOT SCALE 1 <br />SOLUTION TRANSFER PIPE <br />DIA. <br />PCPE <br />O7 <br />425 <br />1 -8" <br />DIA. <br />PCPE <br />O <br />18" DIA SOLID CPE (ADS N -12 OR EQUIVALENT) <br />1 -8" <br />DIA. <br />PCPE <br />SOLUTION TRANSFER PIPE <br />255 <br />777 <br />1 -8" <br />__________ <br />10" DIA. PCPE (ADS N -12 OR EQUIVALENT) <br />t0 <br />86 <br />1 -8" <br />SOLUTION COLLECTION PIPE <br />PCPE <br />18" DIA. PCPE <br />8" DIA. PCPE (ADS N -12 OR EQUIVALENT) <br />SOLUTION TRANSFER <br />SOLUTION COLLECTION PIPE <br />PIPE <br />4" DIA. PCPE HIGHWAY GRADE TERTIARY SOLUTION <br />_ <br />COLLECTION PIPE PLACED ON 75' CENTERS. <br />NOTES <br />1. TOPOGRAPHY PROVIDED BY WESTERN STATES SURVEYING INC. IS <br />BASED ON TOP OF SOIL LINER FILL AS —BUILT FOR PHASE I, II, AND <br />1999 PHASE III AREAS AND FEBRUARY 1998 SURVEY FOR OTHER <br />AREAS SHOWN. 2000 PHASE III AND PHASE IV REGRADING <br />DEVELOPED BY GOLDER ASSOCIATES. <br />2. REGRADED CONTOURS SHOWN FOR PHASE IV REPRESENTS TOP <br />OF SOIL LINER FILL. <br />3. PIPE WORK LAYOUT IS APPROXIMATE. ACTUAL ALIGNMENT TO BE <br />APPROVED BY ENGINEER DURING CONSTRUCTION. <br />4. TRANSFER, SECONDARY AND TERTIARY SOLUTION COLLECTION PIPES <br />SHALL BE PLACED AT A MINIMUM GRADE OF 2 PERCENT. <br />5. ALL PCPE PIPE TERMINATIONS, REGARDLESS OF SIZE, ARE <br />TO BE CAPPED. <br />6. THE LAST 75' OF 18" DIAMETER SOLUTION TRANSFER PIPE IN <br />AREA OF PHASE I PSSA WILL BE 18" DIAMETER PCPE. THE <br />PIPE IN THIS AREA WILL BE PLACED IN A TRENCH WITH A <br />MINIMUM COVER OF 4' OF ORE. <br />7. TERTIARY SOLUTION COLLECTION PIPING SHALL BE INSTALLED <br />TYPICALLY AT A 45 DEGREE ANGLE TO SECONDARY SOLUTION <br />COLLECTION PIPING AND ON APPROXIMATELY 75' CENTERS. <br />MAXIMUM TERTIARY PIPING LENGTHS SHALL BE APPROXIMATELY <br />650'. <br />8. SECONDARY SOLUTION COLLECTION PIPING TYPICALLY SHALL BE <br />INSTALLED PERPENDICULAR TO GRADE, AND WITHIN DRAINAGES <br />WHEN POSSIBLE. <br />PIPE <br />SEGMENT <br />APPROXIMATE LENGTH <br />OF INDIVIDUAL PIPE <br />SEGMENT (FT.) <br />0 0 <br />o 0 <br />TYPE <br />OF <br />PIPING <br />SOLUTION <br />TRANSFER PIPE <br />o <br />o d <br />z <br />Q <br />2,453 <br />BY <br />1 -18" <br />DIA. PCPE <br />N0. I <br />1,342 <br />N � <br />� m <br />1 -18" DIA. <br />SOLID CPE <br />PRIMARY SOLUTION COLLECTION PIPE <br />MRJ <br />GE <br />H4 <br />Q683 <br />6/9/00 <br />M N O <br />O O <br />1 -8" <br />DIA. <br />PCPE <br />SECONDARY SOLUTION COLLECTION PIPE <br />KAJ <br />O <br />0 <br />I GE <br />O <br />484 <br />1 -8" <br />DIA. <br />PCPE <br />O4 <br />801 <br />1 -8" <br />DIA. <br />PCPE <br />O <br />609 <br />1 -8" <br />DIA. <br />PCPE <br />O <br />482 <br />NOT SCALE 1 <br />1-8" <br />DIA. <br />PCPE <br />O7 <br />425 <br />1 -8" <br />DIA. <br />PCPE <br />O <br />492 <br />1 -8" <br />DIA. <br />PCPE <br />O <br />255 <br />1 -8" <br />DIA. <br />PCPE <br />t0 <br />86 <br />1 -8" <br />DIA. <br />PCPE <br />NOTE: <br />PIPE LENGTHS PROVIDED FOR INFORMATIONAL PURPOSES ONLY. ACTUAL PIPE LENGTHS <br />WILL VARY TO SUIT FIELD CONDITIONS. <br />rn <br />3 <br />0 <br />0 0 <br />o 0 <br />v <br />,J`L <br />ADJUSTED LIMITS OF PHASE IVa VLF <br />O w <br />o <br />o <br />o d <br />z <br />z z <br />0 <br />�ma <br />BY <br />CHKD <br />AP'VD <br />N0. I <br />REVISION DESCRIPTION TILLS DRAWING IS NOT APPROVES <br />N � <br />� m <br />BY <br />CHKD <br />N �p <br />a� <br />MRJ <br />GE <br />H4 <br />ISSUED FOR CONSTRUCTION <br />6/9/00 <br />M N O <br />O O <br />UNLESS LAST REVISION IS HAND WRITTEN <br />JFL <br />0 0 <br />N <br />i 5/25/00 <br />KAJ <br />O <br />0 <br />I GE <br />.ON w <br />ON _ <br />r` N <br />/PNm <br />a rn I <br />OtiQQ <br />"O..0 <br />° o <br />IF THE ABOVE <br />BAR DOES <br />no <br />o � <br />Z D a. .0 <br />NOT SCALE 1 <br />INCH THE <br />°^ 00 <br />DRAWING SCALE <br />IS ALTERED <br />ENGINEER'S STAMP <br />Pp01REGIp 14',. <br />28 c= — <br />1'1 � <br />PIPINilli NOT WS�iRl, ED , <br />SOLUTION TRANSFER PIPE ALIGNMENT <br />a <br />aka <br />Scale in Feet <br />0 250 500 1000 <br />1" = 500 feet <br />\! 11 <br />NO. I REVISION DESCRIPTION THIS DRAWING IS NOT APPROVED <br />UNLESS LAST REVISION IS HAND <br />0 <br />o <br />0 <br />0 0 <br />o 0 <br />b <br />,J`L <br />ADJUSTED LIMITS OF PHASE IVa VLF <br />z <br />o <br />o <br />z <br />z <br />z z <br />DATE <br />BY <br />CHKD <br />AP'VD <br />N0. I <br />REVISION DESCRIPTION TILLS DRAWING IS NOT APPROVES <br />DATE <br />BY <br />CHKD <br />AP'VD <br />MRJ <br />GE <br />JFL <br />ISSUED FOR CONSTRUCTION <br />6/9/00 <br />MRJ <br />UNLESS LAST REVISION IS HAND WRITTEN <br />JFL <br />ISSUED DRAFT <br />i 5/25/00 <br />KAJ <br />I GE <br />I GE <br />2002 RECORD DRAWING <br />R/5 Q /Q2 <br />MRJ <br />b <br />,J`L <br />ADJUSTED LIMITS OF PHASE IVa VLF <br />7/26/01 <br />MRJ <br />GE <br />JFL <br />REVISED GRADING PLAN <br />7/10/01 <br />GSL <br />GE <br />JFL <br />REVISED, RE- ISSUED FOR CONSTRUCTION <br />2/16/01 <br />SFD <br />GE <br />JFL <br />18" PIPE LINETYPE CHANGE, RE- ISSUED FOR CONSTRUCTION <br />7/10/00 <br />MRJ <br />GE <br />JFL <br />ISSUED FOR CONSTRUCTION <br />6/9/00 <br />MRJ <br />JMJ <br />JFL <br />ISSUED DRAFT <br />i 5/25/00 <br />KAJ <br />I GE <br />I GE <br />Permit #:I4I Aq by aq4 Confidental?: _b_ <br />Class: Type -Se <br />From: _ To: <br />Doc. Name: • �I- °j f Dw <br />Doc. Date (If no date s amp): <br />CLIENT DATE <br />PRINT ISSUE RECORD <br />a o \ <br />aka- o \ <br />Scale in Feet Z <br />E385 <br />0 50 100 200 <br />1" = 100 feet <br />CvCripple Creek & Victor Gold Mldnp Company <br />Cresson Project <br />ac. A Joint Venture — AngloGold (Colorado) Corp., Manager <br />Tflu PHASE IVa <br />HIGH VOLUME SOLUTION COLLECTION PIPING LAYOUT <br />SHEET 1 OF 1 <br />44 UNION BLVD.. SUITE <br />COLORADO 80228 <br />GSL ""`° MAY, 2000 <br />JOB NO. <br />GE 003 -2142 <br />GE DIGITAL NO. D030 <br />JFL <br />AS SHOWN DWG REV I# <br />2142DO30 10a 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.