My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE46196
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE46196
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:48:26 PM
Creation date
11/20/2007 12:39:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000113
IBM Index Class Name
Permit File
Doc Date
9/20/2001
Doc Name
CIRCES COST ESTIMATING SOFTWARE COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • III IIIIIIIIIIIII III <br />999 <br />CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date: 20-Sep-2001 <br />User : ~ GRS <br />Permit orjob no. <br />Abbreviation <br />Filename <br />Agency or organization name : CO DMG <br />Permit orjob action :New App. <br />Site :Mamm Creek <br />State :Colorado <br />County : Ga~eld <br />TASK LIST (DIRECT COSTS <br />M2000-113 <br />none <br />M113-000 <br />NO TASK DESCRIPTION <br />001 ~ Backfill pit higbwalls with material brougt in by scrapers <br />002 -Transport OB to Highwalls by scrapers <br />003 -Place lonsoil on hiohwall s/ones <br />twl to surace raatrties area <br />on surface Iacilities area <br />cilities area <br />ipes `__ <br />nd pass _, <br />ale house and facilities area <br />USED i SIZE I HOURS COST <br />NA 1 <br />-I ~ 19.00 <br />- <br />---~ $17,867 <br />NA 3 <br />:- -~- t <br />40.00 <br />~~_ $48,435 <br />NA l 1 ~ 6.00 $2, 569 <br />FORM ~FLEETI TASK DIRECT <br />rvH ! <br />~---+-.- <br />i NA~f_ 1 <br />~-NA I 1 <br />NA ~ 2 <br />NA ,~ 1 <br />'.00, $1,815 <br />oo. $a;7is <br />0 <br />0 $6.549 <br />_ <br />_ <br />00 <br />l ~ <br />$2,453 <br />-- <br />- <br />0~ --- <br />$16,177 <br />0~ $11,000 <br />- <br />includes inflation lactor atllustment of <br />OVERHEAD AND PROFIT <br />assume net hours = 50°.5 0l task hours <br />PROJECT MANAGEMENT <br />NA <br />Liability insurance <br />Performance bond <br />Job superintendent <br />Profit <br />TOTAL08 P= $16,928 <br />CONTRACT AMOUNT (tlirect * 0 8 P) _ $131,205 <br />Engineering work and/or contract bid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of Intr. NA total = $6,560 <br />coNnNCENCV - NA' NA total = NA <br />'conringencres accounted for ar task level TOTAL INDIRECT COST= $23,488 <br /> <br />I ~ __ <br />UBroTALS.~ 151.00 $114,277 <br />TOTAL DIRECT COST' _, $114,277 <br />1.55 % of direct total = $1,771 <br />1.05 % of direct total = $1,200 <br />75.50 Itrs'...$/hr $33.50 total = $2,529 <br />10.00 % of direct total = $11,428 <br />TOTAL BOND AMOUNT (direct + indirect) _ $137,765 <br />
The URL can be used to link to this page
Your browser does not support the video tag.