Laserfiche WebLink
n <br />U <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Rewurces <br />1.41 J Sherman 51 , Rnom 215 <br />Denver, Gilootdn R0201 <br />Phunc: 1 t(111 7166-} 567 <br />FA%~ 60.i) H1?~RI06 <br />October 08, 1996 <br />Rick Ullom <br />Rio Blanco County <br />P.O. BOX KK <br />Meeker, CO 81641-0000 <br />III IIIIIIIIIIIIIIII OF COLORADO <br />999 <br />II~~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Roy Ramer <br />Governor <br />lames 5. Lochhead <br />Executive Director <br />Michael B. Long <br />Division Director <br />RE: Johnson Draw, M-95-046, Permit Issuance -County Coosttvction Material Operation <br />Dear Mr. Ullom: <br />On October 07, 1996 the Division of Minerals and Geology found Rio Blanco County to have satisfied <br />the applicable requirements of C.R.S. 34-32.5-101 et sec .for obtaining a mining and reclamation permit. <br />Therefore, a permit is being issued. Two signed originals of [he permit have been executed. We have <br />kept one copy for our files and are enclosing one copy for your use. It is your responsibility to comply <br />with all of the terms of the permit. <br />1. All of the original application materials, as amended and supplemented, are an integral part of <br />your permit. They have been incorporated into the permit by reference. We presume that you have a <br />copy of all of these materials; therefore, none have been enclosed with this mailing. We suggest that you <br />keep a copy of the permit and the permit application at the mining operation as a reference for operating <br />personnel, to help ensure compliance with the tetras of the permit. <br />2. Changes in the mining and reclamation operations that differ from those described in the permit <br />may require a modification to the permit. We suggest consulting the Construction Materials Rules and <br />Regulations and/or contacting us to determine if a revision to the permit is necessary. Rule I.10 pertains <br />to Amendments, Rule 1.9 to Technical Revisions, and Rule 1.11 to Conversions. <br />3. On your permit anniversary date each year, October 7, you must submit an annual fee and an <br />annual report to us. The annual fee for this permit is $550.00. Please consult the Act, Rules and <br />Regulations, and your permit for specific annual report requirements applicable to your mine. <br />If you have any questions, please contact the Division. <br />Sincerely <br />MICHAEL B. L <br />Division Director ~~ <br />MBL/GRS/amm <br />Enclosure <br />cc: James W. Joy, Joy Surveying Company <br />M: \OSAamm\TFAIPMAP160/6.GR5 <br />