My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE45738
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE45738
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:48:05 PM
Creation date
11/20/2007 12:28:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004048
IBM Index Class Name
Permit File
Doc Date
8/3/2004
Doc Name
Response to Appl Consideration
From
OSE
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br />1313 Sherman Street, Room 818 <br />Denver, Colorado 80203 <br />Phone (303) 866-3581 <br />FAX (303) 866-3589 <br />www.water.state.co.us <br />RECEI!/EC <br />AUG 0 3 2~~4 !/ <br />Division of Minerals and Geology 1/ <br />O4' Cp <br />F~~ <br />N <br />,~, <br />+ + <br />~l896 ~ <br />Response to Reclamation Permit Application Consideration <br />DATE: August 3, 2004 <br />TO: Wallace H. Erickson, Environmental Protection Specialist <br />CC: Division 7 Office; Distri t 71 Water Commissioner <br />FROM: Don West, P.E. ~~ / <br />RE: Cedar Point Picture Rock Quarry Pit, File No. M-2004-048 <br />Operator: Robert Daugherty <br />Contact: Robert Daugherty 970/434-8773 <br />Section 25, Twp 45N, Rng 18W, NM P.M., San Miguel County <br />Bill Owens <br />Governor <br />Russell George <br />Executive Director <br />Hal D. Simpson, P.E. <br />State Engineer <br />CONDITIONS FOR APPROVAL ~/ <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. If stormwater is contained on-site, it must <br />infiltrate into the ground or be released to the natural stream system within 72 hours, or all work <br />must cease until a substitute water supply plan, or augmentation plan approved by water court, is <br />obtained. Reclamation plans must ensure water will not be retained onsite for more than 72 hours <br />unless an augmentation plan approved by water court is obtained. <br />^ The proposed operation will consume ground water by: ^ evaporation, ^ dust control, <br />^ reclamation, ^ water removed in the mined product, ^ processing, ^ other:. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit <br />or other type of well permit, as applicable. However, prior to obtaining a permit, an approved water <br />supply plan or decreed plan for augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must then <br />obtain a waiver of objection from all well owners with wells within 600 feet of the permit area or <br />request a hearing before the State Engineer. <br />^ Other: <br />COMMENTS: <br />
The URL can be used to link to this page
Your browser does not support the video tag.