My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE44160
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE44160
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:46:36 PM
Creation date
11/20/2007 11:50:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977317
IBM Index Class Name
Permit File
Doc Name
RED MTN CLAY CO CEDARWOOD CLAY MINE 77-317
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIIIIII <br />s rnre of cot '~RnDO uic Hnnn o. ~•. ago. 999 <br />D EPARTMEN7 OF NATURAL RESOURCES <br />Harris D Sherman. Ezetut~ve Director <br />A11NED LAND NE(;LAA1A'1'IC1N <br />723 Centennial Building, 1313 Sherman Street <br />Denver, Colorado 80203 Tel. (303) 892-3567 <br />C. C. McCall, <br />Administrator <br />RED @IOIJN'IAIN CLAY COMPANY <br />CEDARWOOD CLAY MINE <br />1177-317 <br />1. Legal description 9.9 acres within the lease. Legal description <br />as delineated on the mine plan map. <br />2. Exhibit C-2 permit application area should read lease area. <br />3. Acreage mined/year based on the life of the mine should be corrected <br />to reflect a more accurate mining plan progression. <br />4. Stockout locations for topsoil and overburden must be located in <br />areas disturbed after July 1, 1976, which are within the affected <br />area. Add a statement concerning stockpiling of overburden. <br />5. Replacement of topsoil over the pit sites should be changed from <br />an average depths or approximate depths. <br />6. "Revegetation Guideline for Surface t~tined Areas" or other Plined <br />Land Reclamation Board approved practices. Seeding mixtures and <br />methods of seeding shall conform to guidelines specified in <br />pertinent sections (p.p. 3 - 13 inclusive and p. p. 50 - 53 <br />inclusive). <br />7. Add the statement that equipment utilized in the mining portion of <br />operations will also be utilized in reclamation processes. <br />8. The area to be reclaimed should be specified. <br />9. Topsoil stockpiles must be stabilized to prevent wind and water <br />erosion. <br />10. Haul road into the affected or permit area should be indicated on <br />Exhibit C-3. <br />
The URL can be used to link to this page
Your browser does not support the video tag.