Laserfiche WebLink
• III IIIIIIIIIIIII III <br />999 <br />Project No. CC 49-0064-18 <br />~iceance Creek Road <br />[d}IITE RIVER AGGREGATE'S, INC. <br />Estimated Cost of Reclamation <br />Remove and replace 9,000 cubic yards overburden <br />at 20 cents per yard <br />Seed 4.0 acres at $117.00 per acre <br />Fertilize 4.0 acres at $125.00 per acre <br />Mulch 4.0 acres at $250.00 per acre <br />Soil preparation on 4.0 acres at $15.00 per acre <br />TOTAL <br />$ 1,800.00 <br />468,00 <br />500.00 <br />1,000.00 <br />60.00 <br />$ 3,828.00 <br />This caould be the approximate cost to reclaim the area that will be used <br />by the Division of Highways on this project. <br />RECEIVED <br />DEC 22 1976 <br />RECLAMATION SECTION <br />Colo. Dept. of tfaturzl "eseurces <br />