My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE42376
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE42376
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:44:52 PM
Creation date
11/20/2007 11:07:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997094
IBM Index Class Name
Permit File
Doc Date
10/22/1997
Doc Name
RESPONSE TO RECLAMATION PERMIT APPLICATION CONSIDERATION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• III IIIIIIIIIIIII III • <br />STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br />1313 Sherman Street, Room 818 <br />Denver, Colorado 80:03 <br />Phone (303) 866-3581 <br />FA% 1303) 866-3589 <br />Response to Reclamation Permit Application Consideration <br />DATE: October 22, 1997 /~ <br />TO: lames C. Stevens, Senior Environmental Protection Specialist <br />CC: Division 2 Office; District 14 Water Commissioner 4FC~11lE'~ <br />FROM: Heidi Frey, P.E. OCT 2 <br />RE: Pinon Mine Pit, File No. M-97-094 2 199 <br />Operator: Siloam Stone, Contact: Ferd A. Mueller, (970) <br />~livicinn nt „~ui~~rnn. ,..dno!o.,~. <br />275275 _ <br />Section 36, Twp 21 S, Rng 68 W, 6th P.M., Pueblo County <br />OF' COQ <br />s¢ ~ <br />N~%' <br />.. <br />•~r8'!6~ <br />Roy Romer <br />Governor <br />tames 5. Lochhead <br />Executive Director <br />Hal D. Simpson <br />State Engineer <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. <br />^ The proposed operation will consume ground water by: ^ evaporation, ^ dust control, ^ <br />reclamation, ^ water removed in the mined product, ^ processing, ^ other:. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit or <br />other type of well permit, as applicable. However, prior to obtaining a permit, an approved water <br />supply plan or decreed plan for augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must then obtain <br />a waiver of objection from all well owners with wells within 600 feet of the permit area or request a <br />hearing before the State Engineer. <br />^ Other: <br />COMMENTS: <br />
The URL can be used to link to this page
Your browser does not support the video tag.