My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE42157
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE42157
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:44:41 PM
Creation date
11/20/2007 11:02:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038A
IBM Index Class Name
Permit File
Doc Date
2/29/2004
Section_Exhibit Name
Paonia Loadout 2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I `. §2.05 APPLICATION FOR PERMIT FOR SURFACE OR UNDERGROUND MINING <br />ACTIVITIES --MINIMUM REQUIREMENTS FOR OPERATION AND RECLAMATION <br />PLANS. <br />2.05.1 Objective. <br />No answer required. <br />2.05.2 Operation Plan -Estimated Area for Life of Operation. <br />Coal produced from the Bowie No. 2 Mine is trucked to the loadout near <br />Paonia. The loadout will handle up to 5 million tons per year of coal <br />produced from the Bowie No. 1 and No. 2 Mines and/or other mines in <br />the area. The coal is then loaded into unit trains and shipped to its final <br />destination, typically amid-western coal fired power plant. No additional <br />disturbance is anticipated at the loadout. The loadout is capable of <br />handling the required coal throughput so no expansion should be <br />required. <br />TR-020 <br />2.05 - 1 <br />3/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.