My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE41915
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE41915
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:44:28 PM
Creation date
11/20/2007 10:57:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000052
IBM Index Class Name
Permit File
Doc Date
7/31/2000
Doc Name
CONSTRUCTION PERMIT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• iii iiiiiiiiiiiiiiii • <br />999 <br />STATE OF COLORADO <br />COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT o4~~0~ <br />AIR POLLUTION CONTROL DIVISION y~~- ~ <br />TELEPHONE: (303) 692150 <br />~ ~a76 i <br />CONSTRUCTION PERMIT <br />PERMIT NO: OOFR0237F <br />INITIAL APPROVAL <br />DATE ISSUED: July 31, 2000 <br />ISSUED TO: Rocky Mountain Materials and Asphalt, Inc. <br />THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS: <br />Sand and Gravel Operation located at Highway 67, Fremont County, Colorado. <br />THE SPECIFIC EQUIPMENT OR ACTIVITY SUBJECT TO THIS PERMIT INCLUDES THE FOLLOWING: <br />Material Extraction, Handling, Stockpiling, Hauling, and Associated Conveyors and Transfer <br />Points. <br />THIS PERMIT IS GRANTED SUBJECT TO ALL RULES AND REGULATIONS OF THE COLORADO AIR <br />QUALITY CONTROL COMMISSION AND THE COLORADO AIR POLLUTION PREVENTION AND CONTROL <br />ACT C.R.S. (25-7-101 et se , TO THOSE GENERAL TERMS AND CONDITIONS INCLUDED IN THIS <br />DOCUMENT AND THE FOLLOWING SPECIFIC TERMS AND CONDITIONS: <br />Visible emissions from processing equipment and transfer points shall not exceed twenty percent <br />(20%) opacity during normal operation of the source. During periods of startup, process modification, <br />or adjustment of control equipment visible emissions shall not exceed 30% opacity for more than six <br />minutes in any sixty consecutive minutes. Opacity shall be measured by EPA Method 9. (Reference: <br />Regulation 1, Section II.A.1. 8 4.) <br />2. The particulate emission control measures listed on the attached page (as approved by the Division) <br />shall be applied to the particulate emission producing sources as required by Regulation 1, Section <br />III.D.1.b. <br />3. Construction of this source must commence within 18 months of initial approval permit issuance date <br />or within 18 months of date on which such construction or activity was scheduled to commence as <br />stated in the application. If commencement does not occur within the stated time the permit will expire <br />on January 31. 2002 <br />(See General Condition No. 6., Item 1.) (Reference: Regulation 3, Part B, IV.G.4.) <br />043/0118/001 ver 11 /99 <br />
The URL can be used to link to this page
Your browser does not support the video tag.