Laserfiche WebLink
~~ ~ III IIIIIIIIIIIIIIII ~ <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: 1303) 866-3567 <br />FAY: (303) 832-8106 <br />August 14, 2001 <br />DIVISION OF <br />MINERALS <br />GEOLOGY <br />R E C L A M A T I O N <br />MI NING•SAFETY <br /> B~II Owens <br />Mr. Tim Sheridan Governor <br />Elbert County Greg E Watcher <br />809 Ute AVe. Executive Director <br />Smda, CO 80835 Michael s. Long <br />Division Dnector <br />Re: Allison Gravel Pit, M-2001-010, Permit Issuance -County Construction Material Operation <br />Dear Mr. Sheridan: <br />On August 14, 2001 the Division of Minerals and Geology found Elbert County to have satisfied the applicable <br />requirements of C.RS. 34-32.5-101 et sec .for obtaining a mining and reclamation permit. Therefore, a permit is <br />being issued. Two signed originals of the permit have been executed. We have kept one copy for our files and are <br />enclosing one copy for your use. It is your responsibility to comply with all of the terms of the permit. <br />1. All of the original application materials, as amended and supplemented, are an integral part of your <br />permit. They have been incorporated into the permit by reference. We presume that you have a copy of all of <br />these materials; therefore, none have been enclosed with this mailing. We suggest that you keep a copy of the <br />permit and the permit application at the mining operation as a reference for operating personnel, to help ensure <br />compliance with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those described in the permit may <br />require a modification to the permit. We suggest consuhing the Consttuction Materials Rules and Regulations <br />and/or contacting us to determine if a revision to the permit is necessary. Rule 1.10 pertains to Amendments, <br />Rule 1.9 to Technical Revisions, and Rule 1.11 to Conversions. <br />3. On your permit anniversary date each year, August 14th, you must submit an annual fee and an annual <br />report to us. The annual fee for this permit u $688.00. Please consult the Ad, Rules and Regulations, and your <br />permit for specific annual report requirements applicable to your mine. <br />If you have any questions, please comas the Division. <br />Sincere) <br />MI HAFL B. G <br />Division Director <br />MBL/BMK/bdc <br />Enclosure <br />