My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR13079
DRMS
>
Back File Migration
>
Application Correspondence
>
3000
>
APPCOR13079
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:33:23 PM
Creation date
11/19/2007 2:37:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065
IBM Index Class Name
Application Correspondence
Doc Date
11/16/1984
Doc Name
STORM KING FINDINGS
From
JIM HERRON
To
THE A TEAM CANDY SUSAN MIKE S JIM P BRIAN
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i • III IIIIIIIIIIIIIIII <br />999 <br />DEPARTMENT OF NATURAL RESOURCES <br />David H. Getches, Executive Director <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SHELTON, Director <br />Richard D. Lamm <br />Governor <br />DATE: November 16, 1984 <br />T0: The "A" Team, Candy, S sake S., Jim P., Brian <br />FROM: Jim Herron <br />RE: Storm King Findings <br />Storm King Mines, Inc., has responded to our draft findings document. <br />Their response includes a change in what they want to be included in <br />this permit. Storm King mines (S KM) proposes to develop the mine in <br />two phases: 1) Phase A, which would include construction of the rock <br />tunnel, Mine access road, initial surface facilities as shown on <br />Figure 42-7A, which are primarily portable, and development of a test <br />mine to evaluate hydraulic mining; and 2) Phase B, which would include <br />construction of the permanent surface facilities and loadout facilities <br />including the coal processing waste embankment. <br />Presently, SKM proposes to only permit Phase A. When writing your <br />findings, please ascertain whether the permit application needs to be <br />modified to reflect the permitting of~only Phase A. <br />Two letters concerning the SKM responses are attached for your <br />reference. <br />Please submit findings to me by December 7, 1984. <br />/md <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />
The URL can be used to link to this page
Your browser does not support the video tag.