Laserfiche WebLink
.............................................................................. TRRNSNISSION RESULT REPORT <br />THE FOLLOWING FILE(S) ERRSED <br />FILE FILE TYPE OPTION <br />030 MEMORY TX <br />TEL N0. <br />7219298 <br />PAGE RESULT <br />01101 OK <br />ERRORS <br />1) HRNG UP OR LINE FRIL <br />DIVISION OF MINERALS AND GEOLOGY <br />Dlpartment o(Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 666-3567 <br />FAX; (303) 832-8106 <br />DATE: August 25, 7985 <br />2) BUSY 3) NO RNSWER 4) NO FRCSIMILE CONNECTION <br />STATE OF _ ~QLC~T~ADO <br />Post-it" Fax N <br />o <br />te 7671 Date ~. ~,C> paB~~ <br />~~ <br />`` <br />Tb r W ! ~ From 'Strlac ~ L1 <br />Co./Dept. Co. <br />Phone g ' ~ Phone # <br />Fes B r FgY # <br />1F T. L14n1(L~jafS pq• w)$ NA I'S SL w~ Drev;oK3 dF• <br />........ <br />• Interested Registered Professional Engineers R, ~~, <br />Y <br />Cavemor <br />FROM: Christine Johnston, Division of Minerals and fieol lamp s. Lochheoa <br />Fxor„hie Director <br />RE: Project Bid (C-00.0021 O.C. A'2 Coal Mine - F-obe-t Weaver Michael B. Long <br />Division Director <br />Enclosed is a brief description and Bid Schedule to develop a backtilling and grading plan for a mine <br />site through the Office of Mined Lend Reclamation for the State of Colorado using monies from the <br />Small Operator Assistance Program (SOAP). The State plans to issue a Purchase Order Contract to <br />complete the described work. The project schedule, a description of the selection method and terms <br />and conditions of the Purchase Order Contract follow below: <br />Project Schedule <br />••••••••••••••••••••(RUG 25 '95 05~23PM)••••••••••••• <br />DIV:MINERRLS&GEOL0G1 11! ~IIIII~~I~~II'~~ <br />999 <br />OF <br />August 25. '1985 I Wnr4 flec...1..N.... w..~u_~r_ <br />